Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Milton, West Virginia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
For Contract 2 - Sanitary Sewer Rehabilitation and Lift Station The approximate quantities of work to be bid upon are described as follows: 1 LS Mobilization/Demobilization; 1 LS Videotaping of Project Area; 1 LS Erosion and Sedimentation Control; 60 LF 18" D.I. Gravity Sewer Line; 377 LF Remove Existing Sewer and Replace with 15" PVC SDR-35 Gravity Sewer Line; 4,679 LF Remove Existing Sewer and Replace with 15" D.I. Gravity Sewer Line; 615 LF Remove Existing Sewer and Replace with 12" PVC SDR-35 Gravity Sewer Line; 810 LF 10" PVC SDR-35 Gravity Sewer Line; 41 LF 8" PVC SDR-35 Gravity Sewer Line; 267 LF 6" PVC DR-18 Forcemain; 190 LF 4" PVC SDR-35 Customer Service Lateral; 1,370 LF 4" D.I. Customer Service Lateral; 105 LF 30" Steel Casing (Bore & Jack); 200 LF 24" Steel Casing (Bore & Jack); 105 LF 20" Steel Casing (Bore & Jack); 21 EA 48" Diameter Manhole Base, Cone Top, Regular Casting; 43 EA Remove Existing Manhole and Replace with New 48" Diameter Manhole Base, Cone Top, Regular Casting; 385 VF 48" Diameter Manhole Riser Pipe; 10 EA 15"x4" PVC Wye Connection; 87 EA 15"x4" D.I. Wye Connection; 19 EA 12"x4" PVC Wye Connection; 13 EA 12"x4" D.I. Wye Connection; 2 EA 10"x4" PVC Wye Connection; 1,245 LF WVDOH Type "B" Trench Repair; 330 LF WVDOH Type "C" Trench Repair; 390 LF Asphalt Driveway Repair; 745 LF Concrete Driveway Repair; 285 LF Gravel Driveway Repair; 34 EA Reconnect Existing Service Lateral; 1 LS South Main Lift Station Relocation; 4,000 LF Reclamation of Disturbed Area; $6,740.00 WVDOH Inspection Fee Allowance. The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 360 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day A bidder may not withdraw his bid for a period of ninety-one (91) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Milton Municipal Utility Commission in an amount equal to five percent (5%) of the base bid. Bidders on this work will be required to comply with the President's Executive Order Number 11246 and the provisions of Executive Order No. 10925 as included therein. The requirements for bidders and contractors under this order are explained in the specifications. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21-1D-5. All Bidders are required to have a West Virginia Contractor's License per Section 21-11-11 of the West Virginia Code. Bids received after the scheduled closing time for the reception of bids will be returned unopened to the bidders. The Milton Municipal Utility Commission reserves the right to reject any and all bids. Last day for Questions - Tuesday 8 Feb 2022
Award
Water / Sewer
$5,063,615.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2022
March 21, 2022
Multiple Locations, Milton, WV
Related To This Project
Milton, WV
Bid Date: Mar 30 2023
Milton, WV
Bid Date: Sep 27 2024
Milton, WV
Bid Date: Jun 30 2023
Milton, WV
Bid Date: Jan 12 2024
Milton, WV
Bid Date: Jun 28 2024
Milton, WV
Bid Date: Aug 05 2024
Milton, WV
Bid Date: Aug 27 2024
Milton, WV
Bid Date: Nov 01 2024
Milton, WV
Bid Date: Feb 17 2022
Milton, WV
Bid Date: Dec 06 2022
Milton, WV
Bid Date: Feb 17 2022
West Union, WV
Bid Date: Aug 25 2022
Beckley, WV
Bid Date: Jul 12 2022
Whitesville, WV
Bid Date: Aug 25 2022
Pineville, WV
Bid Date: Aug 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.