Site work and paving for a civil project in Milton, West Virginia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of August 26, 2022, the project has been awarded. A timeline for construction has not been confirmed. For Contract 1 - Morris Memorial Sanitary Sewer Extension The approximate quantities of work to be bid upon are described as follows: 1 LS Mobilization/Demobilization; 1 LS Videotaping of Project Area; 1 LS Erosion and Sedimentation Control; 2,760 LF 10" PVC SDR-35 Gravity Sewer Line; 2,085 LF 8" PVC SDR-35 Gravity Sewer Line; 80 LF 8" D.I. Gravity Sewer Line; 1,460 LF 6" PVC DR-18 Forcemain; 1,940 LF 6" PVC DR-18 Forcemain, Installed in Same Trench as Gravity Sewer Line; 205 LF 4" PVC SDR-35 Customer Service Lateral; 270 LF 16" Steel Casing (Bore & Jack); 205 LF 12" Steel Casing (Bore & Jack); 37 EA 48" Diameter Manhole Base, Cone Top, Regular Casting; 90 VF 48" Diameter Manhole Riser Pipe; 6 EA 10"x4" PVC Wye Connection; 7 EA 8"x4" PVC Wye Connection; 13 EA Customer Service Lateral Cleanout Assembly; 2 EA Pressure Inline Cleanout; 2 EA Combination Vacuum/Air Release Valve; 110 LF WVDOH Type "B" Trench Repair; 1,400 LF WVDOH Type "C" Trench Repair; 270 LF Asphalt Driveway Repair; 110 LF Concrete Driveway Repair; 125 LF Gravel Driveway Repair; 1 LS Aerial Crossing; 1 LS Grand Patrician Lift Station; 1 LS Flea Market Lift Station; 2 EA Existing Grinder Station Decommissioning; 6,300 LF Reclamation of Disturbed Area; $6,740.00 WVDOH Inspection Fee Allowance. The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 360 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day A bidder may not withdraw his bid for a period of ninety-one (91) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Milton Municipal Utility Commission in an amount equal to five percent (5%) of the base bid. Nondiscrimination in Employment - Bidders on this work will be required to comply with the President's Executive Order Number 11246 and the provisions of Executive Order No. 10925 as included therein. The requirements for bidders and contractors under this order are explained in the specifications. All Bidders are required to have a West Virginia Contractor's License per Section 21-11-11 of the West Virginia Code. Bids received after the scheduled closing time for the reception of bids will be returned unopened to the bidders. The Milton Municipal Utility Commission reserves the right to reject any and all bids. Section 746 of Title VII of the Consolidated Appropriation Acts of 2017 (Division AAgriculture, Rural Development, Food and Drug administration, and Related Agencies Appropriations Act, 2017) applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" includes, but is not limited to the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21-1D-5 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,828,010.00

Public - City

Paving, Site Work

37

23

34

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
45
Bidding Soon
431
All Active Projects
165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

img_map_placeholder

Morris Memorial Rd, Milton, WV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.