Site work and paving for a civil project in Spirit Lake, Iowa. Completed plans call for site work for a bridge / tunnel; road / highway; water / sewer project; and for paving for a road / highway.

Work to Be Done: Approximately 1.2 miles of 5" PCC recreational trail including, but not limited to: o Clearing and Grubbing o Embankment-in-Place o Excavation, Class 10, Roadway and Borrow o Topsoil, Strip, Salvage and Spread o Modified Subbase o Shoulder Finishing, Earth o Paved Shoulder, P.C. Concrete, 10 IN. o Removal of Flumes o Excavation, Class 20, for Roadway Pipe Culvert o Aprons, Concrete, 18 IN. DIA. o Aprons, Concrete, 24 IN. DIA. o Aprons, Concrete, 54 IN. DIA. o Apron, Low Clearance Concrete, Equivalent Diameter 18 IN o Culvert, Concrete Roadway Pipe, 18 IN. DIA. o Culvert, Concrete Roadway Pipe, 24 IN. DIA. o Culvert, Concrete Roadway Pipe, 54 IN. DIA. o Culvert, Low Clearance Concrete Entrance Pipe, Equivalent Diameter, 18 IN. o Corrugated Pipe Culvert, Dual-Wall HDPE, 8 IN. DIA. o Aprons, Metal, 8 IN. DIA. o Manhole, Storm Sewer, SW-402 o Intake, SW-512, 24 IN. o Intake, SW-513, 36"X36" o Intake, SW-513, 48"X48" o Subdrain, Perforated Plastic Pipe, 6 IN. DIA. o Subdrain, Standard, Non-Perforated, 6 IN. o Subdrain Outlet, DR-303 o Remove Storm Sewer Pipe Less Than or Equal to 36 IN. o Erosion Stone o Removal of Pavement o Removal of Recreational Trail o Recreational Trail, Portland Cement Concrete, 5 IN. o Recreational Trail, Portland Cement Concrete, 6 IN. o Recreational Trail, Portland Cement Concrete, 8 IN. o Special Compaction of Subgrade for Recreational Trail o Detectable Warnings o Driveway, P.C. Concrete, 6 IN. o Driveway, P.C. Concrete, 8 IN. o Fence, Safety o Gate, Field Fence, 16 FT o Traffic Signalization, Rectangular Rapid Flashing Beacon o Painted Pavement Markings, Waterborne or Solvent Based o Safety Closure o Traffic Control o Patch Subdrain o Mobilization o Hickinbottom Intake o C-1 Connection o C-2 Connection o Field Tile Exploration, Field Verification o Removal of Existing Hickenbottom Intake o Removal of Pipe aprons o Recreational Trail Signs o Removal of Field Entrance Gate o Surfacing, Driveway, Granular o Seeding and Fertilizing (Rural) o Silt Fence o Removal of Silt Fence or Silt Fence for Ditch Checks o Maintenance of Silt Fence or Silt Fence for Ditch Checks o Stabilized Construction Entrance, EC-303 o Perimeter and Slope Sediment Control Device, 9 IN. DIA. o Removal of Perimeter and Slope Control Device o Mobilizations, Erosion Control See Bid Form for exact quantities. Plans, Specifications, and Contract Documents: Complete digital project bidding documents are available at electronically. You may download the digital plan documents at no charge. All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. All proposals shall be plainly legible, sealed, and addressed to the Dickinson County Auditor, Attn: Lori Pedersen, 1802 Hill Ave., Spirit Lake, IA 51360. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. A certified check or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the City. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual. The work shall be completed as follows: Work shall be substantially completed within 50 working days with final completion date of July 22, 2022. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa statutes, providing that the award of the contract will be made to the lowest responsible bidder submitting the lowest acceptable bid, which shall be given without regard to state or local law whereby preference is given on factors other than the amount of the bid. The right to accept or reject any or all bids and to waive informalities is reserved.

Award

Roads / Highways

$838,356.00

Public - County

Paving, Site Work

67

11

4

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
25
Bidding Soon
394
All Active Projects
136
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2022

April 11, 2022

July 22, 2022

img_map_placeholder

Multiple Locations, Spirit Lake, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.