Published May 22, 2023 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Bethany, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of 05/03/2022 This project has been awarded to L & T with no awarded amount given. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Surface preparation, painting and repairs of the 250,000 gallon elevated water tower including the high pressure power washing to an SSPC-SP1 of all exterior surfaces, the spot surface preparation to an SSPC-SP11/SP6 of all corroded and failed areas of the existing exterior coating system, and the application of a three-coat acrylic exterior coating system, the complete coating removal of the existing interior, dry and interior, wet coating systems and full preparation to an SSPC-SP10 of all interior, dry and interior, wet surfaces and the application of a three-coat epoxy coating system on all interior locations, installation of a non-freeze drain valve and coupling on the tank riser pipe, installation of an internal tank mixing system, installation of a new submerged cathodic protection system, and miscellaneous minor exterior and interior repair items as listed. To be provided as part of this work shall be full interior dehumidification and required temperature control equipment and a temporary hydropneumatic tank. The Project timeframe is 90 days and is intended to be constructed in the Spring / Summer 2022 with all work completed by July 4, 2022. An exterior and interior tank condition report for the elevated tower was completed in September 2020 and is included as part of the Bidding Documents. Photographs that accompanied the tank inspection report are available for review at the offices of the Engineer during normal business hours for verification of tank conditions, work items, and repair areas specified Bids will be received for a single prime Contract. Bids shall be on a unit price or lump sum basis, with bid items as indicated in the Bid Form The project engineer for the project is Greg Gustafson, P.E., ggustafson@bernsclancy.com The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. To request documents call 217-384- 1144 or email projects@bernsclancy.com. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statues mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The De Minimis Components, Minor Components and Pig Iron waivers apply to this contract.

Award

Water / Sewer

$500,000.00

Public - City

Renovation, Site Work

9

14

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Flags and Banners, Flags
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
57
Bidding Soon
562
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

June 1, 2022

img_map_placeholder

To Be Determined, Bethany, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elevated Water Tower Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.