BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pinedale, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Award Details Contract Award Date: Nov 01, 2022 Contract Award Number: 6982AF23C000002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: GLJMLMKQVWZ7 Contractor Awarded Name: CENTURY COMPANIES, INC. Contractor Awarded Address: Lewistown, MT 59457-1732 USA Base and All Options Value (Total Contract Value): $8821628.44 The Invitation for Bid (IFB) is in Attachments/Links section of this solicitation notice. The PDF, IFB document is titled IFB_WY FLAP 740(1) Skyline Drive and Fremont Lake Road. PLEASE NOTE THAT THERE IS AN AMENDMENT TO THIS SOLICITATION NOTICE See the Attachments/Links section. The Amendment PDF is titled Amendment A001 Skyline Drive _ Fremont Lake Road Sol No: 6982AF22SS00009 PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME PROJECT NUMBER: WY FLAP 740(1) Skyline Drive & Fremont Lake Road Skyline Drive (designated as County Road 740) and Fremont Lake Road (designated as US Forrest Service Road 111) are located in the town of Pinedale, Sublette County, Wyoming, and provides access to Fremont Lake, Bridger-Teton National Forest, several campgrounds, lodges, trailheads, picnic areas, and numerous privately-owned properties. The County Road 740 begins at the junction with State Route 191 in the town of Pinedale and continues north 14 miles to Elkhart Park Trailhead. Skyline Drive portion of the project starts 10 miles north of the intersection of CR 740 and SR 191. Lower Fremont Lake portion of the project starts at the intersection of CR 740 and Fremont Lake Road. Lower Fremont lake Road is primarily on US Forest Service land and is maintained by Sublette County. Both routes are functionally classified as a low volume road. Facilities along the route are associated with the use of adjacent lands, and the majority of traffic on Skyline Drive and Lower Fremont Lake Road is related to recreational use for the forest trails and lake recreation. SCOPE OF WORK: SCHEDULE A Skyline Drive: The existing Skyline Drive is a two-lane paved roadway with varying widths and variable width unpaved shoulders, as well as multiple paved and unpaved pull-offs and intersecting roadways. Roadway shoulder widths are typically narrow or non-existent. The roadway surface is showing signs of deterioration including thermal and block cracking with some areas showing signs of fatigue cracking. The speed limit on the route is currently not posted. The entire 4.3 miles is in steep mountainous terrain with narrow roadway bench widths along the majority of the route. There are two parking areas with trail access at the end of the route. Daily traffic is approximately 1000. The proposed road improvements include pulverizing and paving, minor widening, grading, and drainage improvements to 4.3 miles of Skyline Drive. Option X Fremont Lake Road: The existing Lower Fremont Lake Road (FS 111) is a two-lane gravel roadway with varying widths, unpaved pull-offs and intersecting roadway, public parking lots to access Fremont Lake recreation, driveways to private properties, and a private lodging. Roadway shoulder widths are typically narrow or non-existent. The gravel roadway surface is showing signs of deterioration including wash boarding and rutting. The speed limit on the route is currently not posted. The entire 1.47 miles is in rolling terrain. There is a parking area with boat ramp to access the lake at the end of the route. Daily traffic is approximately 500. The project will provide minor widening, resurfacing, restoration, and rehabilitation to the 1.47 miles of Fremont Lake Road, which is the primary access to Fremont Lake. The project begins at the existing cattleguard and terminates at the end of the boat ramp parking lot. Option Y Parking Lots: Two parking lots at the northern end of Skyline Drive project limit and approach roads and campground loop. This option will include a fog seal pavement preservation, cleaning and sealing of cracks, asphalt concrete pavement patch, and pavement striping on the two parking lots, campground loop connection road. SIGNIFICANT QUANTITIES: Approximate quantities for major work items: o30 acres of clearing and grubbing o6,200 cubic yards of roadway excavation o2,000 cubic yards of subexcavation o1,250 tons of Rock Buttress, Mechanically Placed o10,700 tons of roadway aggregate o4.5 miles of full depth reclamation o15,000 tons of asphalt concrete pavement (superpave) o500 square yards of asphalt concrete pavement patch o2,700 linear feet of standard underdrain system o26.5 miles of Pavement Markings, Type C, Solid o6,000 hours of Temporary Traffic Control, Flagger o1,950 hours of Temporary Traffic Control, Pilot Car ESTIMATED TOTAL COST: The anticipated cost range is between $5,000,000 and $10,000,000 for combined Schedule A and Options X and Y. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON SEPTEMBER 22, 2022 Questions can be submitted to CFLContracts@dot.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FHWA Small Business Subcontracting Goals (As of FY 2022) Business Size Goal (%) SB 46.0% SDB 5.0% HUBZone 3.0% WOSB 5.0% SDVOSB 3.0%

Award

Roads / Highways

$8,821,628.00

Public - Federal

Paving, Site Work

529

16

2

9

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
39
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2022

November 30, 2023

img_map_placeholder

Skyline Dr & Fremont Lake Rd, Pinedale, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.