BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Butte, Montana. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

PROJECT LOCATION The Project is divided into 2 sites, both located in Silver Bow County. Site 1 is located in Sections 1, 2, 11, and 12 of Township 3 North, Range 10 West, approximately 1 mile east of Fairmont Hot Springs. Site 2 is approximately 0.5 miles southwest of Ramsay in Section 23 of Township 3 North, Range 9 West. The Project sites are shown on the Drawings and described in the Special Provisions. PROJECT WORK DESCRIPTION The Work will consist of, but is not necessarily limited to, providing all labor, materials, earthwork, and incidentals necessary to complete the Work as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Work at Site 1 consists of constructing approximately 1.2 miles of asphalt surfaced trail from the north end of Durant Canyon to Fairmont Road, constructing the Gregson Station trailhead, amenities, and access road, and installing trail and road signage. The Work also includes repairing, replacing, or installing approximately 2.7 miles of barb wire fence, installing 6 barb wire gates and 1 cattle guard, enhancing the Fairmont /Milwaukee Road approach, installing approximately 265 feet of buried stock water pipeline and 1 stock tank including valves and fittings, and other work as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Work at Site 2 consists of installing one 46-foot long prefabricated steel bridge across Silver Bow Creek, driving bridge helical piers, constructing reinforced concrete bridge caps, constructing approximately 1,250 linear feet of gravel access road, installing approximately 1,975 linear feet of smooth wire fence, constructing and reclaiming temporary access roads, installing culverts, and other works as shown on the Drawings and described in the Special Provisions and Technical Specifications. Construction will be completed in 2022 with no winter shutdown period. Site visit location - The conference and Site visit will begin at Site 2 located at the at the south access point into the project area, located approximately 2.2 miles west on German Gulch Road from the Interstate-15/German Gulch Road interchange. The Pre-Bid Conference and Site visit will continue at Site 1, located at the proposed Gregson Station trailhead off Fairmont Road (approximately 1 mile east of Fairmont Hot Springs), following completion of the Site 2 visit.

Bid Results

Bridges / Tunnels

$52,500.00

Public - City

Paving, Site Work

56

13

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
92
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

April 18, 2022

img_map_placeholder

Multiple Locations, Butte, MT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.