Demolition, site work and new construction of an educational facility in Worcester, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Contractor Qualification DCAMM Certificate Doherty Memorial High School Trade Bidders have been pre-qualified for this project. Bids will be received only from bidders that will be notified by the City as being pre-qualified. ONLY PRE-QUALIFIED TRADE CONTRACTORS CAN BID THIS PROJECT. Bid Package #4 The project scope generally includes: Replacement of the existing High School with a new, 1,670 student High School, constructed adjacent to the existing high school. The project scope generally consists of constructing a new 424,600+ SF building including classrooms, administrative office areas, Media Center, Gymnasium, Cafeteria, Auditorium, Kitchen/Serving, and a 45,547sf parking garage. The new building is multi-story (on five main levels, one grade floor); fireproofed steel-framed; masonry veneer, metal composite panel; with single-ply membrane roofing, aluminum windows, and with all associated work including site work, architectural, food service, structural, elevators, fire suppression, plumbing, HVAC, electrical, and voice/data/ communications work. Site work generally includes earthwork, utilities, paving, sports field, lawns, plantings, site improvements and other items as indicated in the drawings and specifications. The project is a Chapter 149A Project; the Construction Manager (CM) is Fontaine-Dimeo JV and the Owner's Project Manager is Aecom Tishman. This work is a phased project with early bidding and early construction consisting of enabling site work at the existing school to add parking, access and separation of the existing site from the construction site which has been completed; followed by early sitework, structural (concrete and steel) bid, including foundation waterproofing works that are ongoing. Under this bid phase; general bidding, construction and occupancy of the school building; followed by the parking lot construction; and lastly the sports field construction. Refer to the detailed schedule and phasing plan published herein.

Post-Bid

Educational

$239,000,000.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

118 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
181
Bidding Soon
3,274
All Active Projects
1,356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

April 29, 2022

img_map_placeholder

299 Highland St, Worcester, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.