BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a sidewalk / parking lot in Bloomer, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Work on this contract consists of 3700 SF New Concrete Sidewalk with 6-Inch Aggregate Base, 590 SF Concrete Driveway Apron Replacement, 400 SF Modular Block Retaining Wall with Cast-in-Place Cap, 18 CY Concrete Pavement Replacement. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Bids shall be on the forms provided for that purpose and per the Contract Documents prepared by CBS Squared Inc. identified as "17th Avenue Sidewalks". Bidder is required to deliver the original certified check or bid bond within 72 hours of the bid opening to CBS Squared, Inc., ATTN: Tyler Hastings, 770 Technology Way, Suite 1A, Chippewa Falls, WI 54729. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. Bidders must submit a Bidders Proof of Responsibility in accordance with the Instructions to Bidders. The City of Bloomer reserves the right to reject all bids, without cause, and accept the bid that is in the best interest of the City of Bloomer.

Bid Results

Sidewalks / Parking Lot

$124,406.00

Public - City

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
43
Bidding Soon
621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

March 7, 2022

Project location map

17th Ave, Bloomer, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.