BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of a mixed-use development in Whitehouse, Ohio. Completed plans call for the renovation of a educational facility.

All bids must include a Bid Guaranty, as described in the Instructions to Bidders. Prevailing wage rates do not apply. No bidder may withdraw its bid within 60 days after the opening; the Board reserves the right to waive irregularities, reject any or all bids, and conduct necessary investigations to determine bidder responsibility. The Project is the bid of the Locker Replacement Project ("the Project"). The Project and Work for the Project consists of the replacement of lockers at Anthony Wayne Junior High School, located at 6035 Finzel Road, Whitehouse, Ohio 43571. Bids recevied: 1. Midwest Contracting - $91,920.00 2. John M Jones - $78,595.00 3. Van Tassel Construction - $87,800.00

Award

Educational

$90,600.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
157
Bidding Soon
2,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

June 1, 2022

Project location map

6035 Finzel Rd, Whitehouse, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.