BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Suisun City, California. Completed plans call for site work for a water / sewer project.

This project is located in Suisun City's west and east docks in the marina as shown in Attachment "A" - Location Map. The work to be performed, in general, consists of supplying all labor, materials, tools, equipment, implements and methods of process to complete the following work: Removing and replacing the existing 112 dock boxes, which are potable water points of connection. This includes disconnecting and reconnecting the potable water system and electric power in the new supplied dock boxes. This project has an accelerated timeline for the Contractor to perform this contract work. The sequence is as follows: The construction contract is anticipated to be brought in front of the City Council on February 15, 2022 to authorize the City Manager to enter into a construction contract with the Contractor. Moreover, the Notice of Award is anticipated to be overnighted to the Contractor on February 16, 2022, and the Contractor will have 10- calendar days to return the signed Contract with required Bonds and Insurance documents to the City. The pre-construction meeting is anticipated to be held on February 25, 2022 at City Hall, and at that time the Notice to Proceed will be issued to the Contractor. From the issuance of the Notice to Proceed, the Contractor shall diligently perform the necessary work to complete the Project by April 8, 2022. Questions regarding this project shall be submitted via email to Janet Hull, Recreation Manager, jhull@suisun.com. No questions will be accepted after 12:00 noon on Friday, January 28, 2022, unless subsequently modified by the City by addendum Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Any such inquiries or questions, submitted after bid opening, will not be treated as a bid protest. All proposals shall be valid for a period of sixty (60) days after the bid opening. The City of Suisun City reserves the right to reject any and all bids or to waive any defects or informality in the bidding. the Engineers Estimate is $225,000. Punch List items be completed by June 17, 2022.

Post-Bid

Water / Sewer

$225,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
90
Bidding Soon
1,869
All Active Projects
787
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

March 7, 2022

img_map_placeholder

800 Kellogg St, Suisun City, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.