Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 5, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a bridge / tunnel in Bear Creek, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project consists of replacing existing pipe railing with structure mounted guiderail, installing standard approach guiderail, installing new steel floor beams adjacent to existing floor beams and rip rap scour protection of abutment footing. CLARIFICATION DEADLINE 2/3/2022 2:00 PM

Award

Bridges / Tunnels

$88,121.00

Public - City

Paving, Site Work

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
191
Bidding Soon
2,611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

Project location map

To Be Determined, Bear Creek, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed