Site work for a water / sewer project in Miles City, Montana. Completed plans call for site work for a water / sewer project.

As of April 4, 2022 This project is already awarded to 21 Construction with the awarded amount of $1,497,105.25. Removal and replacement of pond liner in thirteen fully lined 0.5 acre fish rearing ponds, eighteen sloped-lined 1.0 acre ponds and three sloped-lined 1.5 acre ponds. Project will also consist of maintenance grading of the clay base in three slope lined ponds, incidental grading, and compaction of the subgrade as required, failed slope reconstruction using geoconfinement system, and other incidentals and project work as depicted in the contract documents. Engineer's Project Cost Estimate: Approximately $1.68 million If you would like any further information, please contact Phil Jagoda at (406) 841-4009. All bids over $25,000.00 must be accompanied by a bid security meeting the requirements of the State of Montana in the amount of 10% of the total bid. After award, the successful bidder must furnish an approved Performance Security and a Labor & Material Payment Security each in the amount of 100% of the contract. No bidder may withdraw his bid for at least thirty (30) calendar days after the scheduled time for receipt of bids except as noted in the Instruction to Bidders. The Owner reserves the right to reject any or all bids and to waive any and all irregularities or informalities and the right to determine what constitutes any and all irregularities or informalities. Mobilization/Demobilization, insurance & bonding Kettle Demolition on kettles #1, 2, 8, 9, 10, & 11 New Kettle Construction for kettles #1, 2, 8, 9, 10, & 11 Maintenance Grading of Clay Lined Ponds #1 and #2 Maintenance Grading of Clay Lined Ponds #6 through #15 Contractor will be required to coordinate work with the Fish Hatchery Manager, as the sequencing of the work will be highly dependent on the fish rearing requirements of the hatchery ponds and draining or filling of specific ponds for fish needs. Completion- November 30, 2022.

Award

Water / Sewer

$1,497,105.00

Public - State/Provincial

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
8
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

May 2, 2022

img_map_placeholder

To Be Determined, Miles City, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.