EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2022 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a civil project in Mitchell, South Dakota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of March 24, 2022, project has awarded to: 1. Maguire Iron Inc. Scheduled A -$354,200 2.H & W Contracting, LLC Scheduled B - $674,571 Estimated budget is; Scheduled A - $600,000 Scheduled B - $440,000 Bids are invited upon the general items of work as follows: Bid Schedule A: - Clean, inspect and repair coatings on the interior wet portions of the water tower - Wash and overcoat exterior of the water tower - Surface preparation and coating of some parts of the interior dry areas - Cut and install larger access in upper dry tube - Install new feed pipe into wet riser - Furnish and install tank mixer - General electrical improvements Bid Schedule B: - Remove and replace various sized buried valves, pipe, fittings and connections - Remove underground valve vault and replace with a packaged steel vault - Reroute pipe into proposed wet riser pipe - Complete associated improvements such as wiring, site grading, seeding and related items Bidders may bid either bid schedule. It will be agreed by bidders that all quantities of work will be performed in accordance with the provisions of the specifications and at the unit price bid. Bidders agree to furnish all labor, material, and equipment necessary to complete all the work as shown in the plans and specifications. Each bid must be accompanied by a certified check or bank draft payable to the order of the City of Mitchell, South Dakota, in an amount equal to five percent (5%) of the total bid. A bid bond in an amount equal to ten percent (10%) of the total bid will be accepted in lieu of a certified check or bank draft. Surety for bid bond must be authorized to do business in the State of South Dakota. Pursuant to State Law, a copy of the bidder's sales and use tax license and a copy of the bidder's excise tax license as issued by the State of South Dakota must accompany the bid. In lieu of a copy of the license, the bidder shall submit appropriate evidence that the bidder and all affiliates have the appropriate licenses. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The goal for Minority-Owned Business Enterprise (MBE) on this project is one percent (1%) and the goal for Woman-Owned Business Enterprise (WBE) on this project is four percent (4%). The goals and other requirements for bidders and contractors under this regulation which concerns utilization of disadvantaged/minority business enterprises are explained in the Contract Documents. Bidders are also reminded that not less than the minimum wages as determined by the Davis-Bacon Act and set forth in the Contract Documents must be paid on this project and that the contractor and/or subcontractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or natural origin. Bids may be held by the City Council for a period of not more than thirty (30) days from the date of opening of bids for the purpose of reviewing the bids, investigating the qualifications of the bidders and completing financial arrangements prior to awarding the Work. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding and make awards to the Owner's best interest. MBE (1%), WBE (4%) The work shall be substantially complete on or before October 30, 2023 ;General Conditions within 30 days of the Date of Substantial Completion. Bid Results Schedule A - Maguire Iron Inc - $287,640.00 Schedule B - H & W Contracting LLC - $547,331.00

Award

Water / Sewer

$1,028,771.00

Public - City

Renovation, Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Hooks, Slings, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
140
All Active Projects
64
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2022

April 25, 2022

img_map_placeholder

To Be Determined, Mitchell, SD

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

West Water Tower Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.