BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Iron Mountain, Michigan. Completed plans call for the renovation of a 2,725-square-foot educational facility.

Minimum Specifications: Izzo-Mariucci Commons Lunchroom Remove approximately 1,250 sqft of drywall form the "gold" soffit system. Add a 4" drywall soffit reveal to the outside perimeter edge of the soffit to allow room for the new acoustical ceiling system. Paint new drywall soffit reveal and vertical surface of the existing soffit to match. Install a new acoustical ceiling grid and tile in the area where the drywall ceiling was removed. 1st floor Izzo-Mariucci Commons Boys and Girls Bathrooms Remove approximately 475 sqft of drywall from the existing ceiling. Install a new acoustical ceiling grid and tile in the area where the drywall ceiling was removed. 2 nd floor Izzo-Mariucci Building Boys and Girls Bathroom/Locker Room Remove approximately 1,000 sqft of drywall from the existing ceiling. Install a new acoustical ceiling grid and tile in the area where the drywall ceiling was removed. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Board or the Superintendent of the District. A Board shall not accept a bid that does not included this sworn and notarized disclosure statement. This Board reserves the right to accept or reject any and all bids.

Post-Bid

Educational

$40,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
97
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2022

March 28, 2022

img_map_placeholder

500 Carpenter Ave, Iron Mountain, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.