BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Aurora, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Repair Concrete Curbs, Walkways, and Ramps Project Number 554-22-148 Rocky Mountain Regional Veterans Affairs Medical Center (RMRVAMC) 1.0 - OBJECTIVE: The Department of Veterans Affairs has a requirement to install several concrete walkways and wheelchair curb cuts throughout the RMR VAMC site. 2.0 - STATEMENT OF WORK LINE ITEM 1: o Contractor shall furnish and install a concrete 6' wide by 4" thick tertiary walkway beginning at the northeast corner of the Parking Staff North (PSN) garage, running north approximately 94 feet, and terminating at an existing VA owned sidewalk that will service the new Psychiatric Residential Rehabilitation Treatment Program (PRRTP) building and the Fisher House. Reference attached detail. o Proposed path of sidewalk runs east of a peninsula containing a curb-surround and landscaping stone. Contractor shall remove and dispose of existing landscaping stone as necessary. o Proposed path of sidewalk runs adjacent to a monument sign. Contractor shall taper or angle termination of sidewalk as necessary to keep clear of sign. o Contractor shall compact and tamp soil, set forms, and pour and grade walkway. o Contractor shall follow the VA Site Design manual and all applicable specification sections in the installation of this walkway. LINE ITEM 2: o Contractor shall furnish and install a concrete 6' wide by 4" thick secondary walkway beginning at the sidewalk at the southeast corner of the RMRVAMC campus 70' west of Fitzsimons Parkway, running eastward north of two Xcel Energy transformers, turning northeast at a 45 degree angle, and terminating in the existing north-south sidewalk on the west side of Fitzsimons Parkway, a total of approximately 120 linear feet. Reference attached detail. o Contractor shall remove and dispose of existing compacted soil and sod. o Contractor shall compact and tamp soil, set forms, and pour and grade walkway. o Contractor shall follow the VA Site Design manual and all applicable specification sections in the installation of this walkway. LINE ITEM 3: o Contractor shall furnish and install a concrete ADA compliant wheelchair curb cut at the pedestrian island at the south entrance of the RMRVAMC campus, allowing wheelchair egress from the island across the drive leading into the Parking Visitor South (PVS) garage and toward the sidewalk outside Clinic Building South (CBS.) Reference attached detail and typical existing curb cut detail. o Contractor shall furnish and install an additional ADA compliant wheelchair curb cut on the sidewalk outside CBS creating a pedestrian crossing from the island to the CBS sidewalk. o Contractor shall saw cut, grade, finish, and paint safety yellow or similar to match existing wheelchair curb cuts. o Contractor shall stripe newly created pedestrian crossing to match existing on site per specifications. o Contractor shall furnish and install pedestrian crossing signs for traffic entering and exiting the underground portion of the PVS garage per specifications and VA Signage Design Manual. o A snowmelt system is installed in the drive leading underground to the PVS garage directly adjacent to the area of the proposed cuts. Contractor shall take all precautions not to disturb or damage this system. o Contractor shall follow the VA Site Design manual, VA Barrier Free Design Guide, VA Signage Design Manual, ADA requirements, and all applicable specification sections in the installation of this pedestrian crossing. 3.0 GENERAL: Contractor and/or Sub-contractors are encouraged to attend a pre-bid walkthrough of the work before submitting a bid. The date and time of this walkthrough will be determined by the Contracting Officer. Contractor (CO) and/or subcontractors shall be responsible for making any clarification requests that arise at the pre-bid walkthrough directed to the CO prior to the bidding of work. The Project Magnitude of the requirement is estimated to be between $25,000 and $100,000. The Department of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the contractor have a "Competent Person" on the job at all times (must have a 30-hour OSHA card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Contractor must submit a Site-Specific Safety Plan (SSSP) to include Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA) for each construction activity. This plan shall detail fire, construction and health-related safety measures, in addition to listing training records for all employees for the previous year. This project shall conform 100% to all VA standards and specifications, OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes. In addition, any part of any VA specification that is not up to current design and construction practice shall be brought to the attention of the CO and COR for further evaluation. Design is to follow all information outlined in VA Technical Information Library (TIL) located at http://www.cfm.va.gov/til/dGuide.asp unless otherwise approved in writing by VA. Contractor shall completely prepare site for building operations, including any necessary demolition and removal of existing materials and structures, and furnish labor and materials to perform all work. Actual dimensions shall be verified by contractor before start of work. All utility shutdowns shall be coordinated with COR at least 10 days prior. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - Federal

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
999
All Active Projects
412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 1, 2022

img_map_placeholder

1700 N Wheeling St, Aurora, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.