BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Brookings, Oregon. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

All Schedules Combined $970,000 - $1,190,000 Both Additive Alternates Combined $275,000 to $335,000. 1. Schedule A - Avenue Water Line Improvements a. Construct new water line improvements along Avenue from the intersection of Avenue and Parkview Drive to approximately 1,250 feet South. b. Work includes the following main items: 1. Installation of approximately 1,285 lineal feet (lf) of 8-inch C900 PVC water line, 100 lineal feet (lf) of water service line, and various other water line types and sizes as required for the improvements as shown on the Plans. 2. Various water line appurtenances including gate valves, fittings, service lines, and connections. 3. Modify existing Pressure Reduction Valve (PRV) vault piping, providing new 8-inch Pressure Reduction Valve, 8-inch Gate Valves, various fittings, piping, and piping supports. Modification also includes removing and relocating existing 4-inch Pressure Reduction Valve, 4-inch gate valves, and reconfiguring the existing parts and new parts as shown on the Plans. Modification also includes relocation of existing fire hydrant and fire hydrant valve. 4. Remove from service, demolish, and restore site for existing Avenue Pump Station #2 as shown on the Plans. 5. Other work includes ac pavement removal and replacement, and landscaping. 2. Schedule B - Alder Street Water Line Improvements a. Construct new water line improvements along Alder Street from Memory Lane to Railroad Street. b. Work includes the following main items: 1. Installation of approximately 1,530 lineal feet (lf) of 8-inch C900 PVC water line, 580 lineal feet (lf) of water service line, and various other water line types and sizes as required for the improvements as shown on the Plans. 2. Various water line appurtenances including gate valves, fire hydrants, fittings, service lines and connections. 3. Other work includes removal and replacement of sanitary sewer service laterals (if required), ac pavement removal and replacement, and landscaping. 3. Schedule C - Memory Lane Water Line Improvements a. Construct new water line improvements along Memory Lane from Cove Road to Alder Street. b. Work includes the following main items: 1. Installation of approximately 1,320 lineal feet (lf) of 8-inch C900 PVC water line, 550 lineal feet (lf) of water service line, and various other water line types and sizes as required for the improvements as shown on the Plans. 2. Various water line appurtenances including hot tap sleeve and valve, gate valves, blow offs, fire hydrants, fittings, service lines and connections. 3. Other work includes removal and replacement of sanitary sewer service laterals (if required), concrete removal and replacement, curb & gutter removal and replacement, ac pavement removal and replacement, and landscaping. B. Additive Alternates 1. Additive Alternate 1 - Alder Street Inlay a. Construct new asphalt concrete pavement inlay along Alder Street from Memory Lane to Railroad Street. b. Work includes the following main items: 1. Roadway improvements along Alder Street including approximately 3,600 square yards of cold plane pavement removal, 450 square yards of repair area, and 500 tons of asphalt concrete. 2. Other work includes demolition work, aggregate base, water valve adjustments, stop bars, striping, and other miscellaneous items. 2. Additive Alternate 2 - Memory Lane Inlay a. Construct new asphalt concrete pavement inlay along Memory Lane from Cove Road to Alder Street. b. Work includes the following main items: 1. Roadway improvements along Alder Street including approximately 5,380 square yards of cold plane pavement removal, 900 square yards of repair area, and 720 tons of asphalt concrete. 2. Other work includes demolition work, aggregate base, water valve adjustments, manhole adjustments, striping, and other miscellaneous items.

Bid Results

Water / Sewer

$1,114,000.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
61
All Active Projects
28
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

May 2, 2022

img_map_placeholder

Multiple Locations, Brookings, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.