Updated September 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Independence, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

Submission of a proposal shall be deemed a firm offer and is not revocable within 120 days after response deadline. Deadline for questions August 10, 2022, 4:00 p.m. local time Notification of award October 24, 2022 Project to be advertised in Summer 2024 for a Summer 2024 construction. The City of Independence, Municipal Services Department, requests proposals from qualified consulting engineering firms to prepare preliminary engineering plans, right-of-way plans, legal descriptions, final plans, bid documents, and provide technical support services during construction for the 24 Highway Complete Streets Phase 3, a MoDOT cost-share project. 24 Highway Complete Streets Phase 3 from Wilson Rd to 400 feet West of Sterling Ave as a part of J4S3405 project from 500' West of River Blvd to Wilson Rd. The conceptual design and cost estimate were completed and found that the total cost estimate was more than $2 Million over the budget. Due to safety funds deadline, MoDOT staff and City staff decided to separate this project into two phases. Phase 2 - from 400 feet West of Sterling to 500 feet West of River Blvd. Phase 3 - Wilson Rd to 400 feet West of Sterling. The City submitted and received approval for a MoDOT cost share for Phase 3 project. This project will provide for the improvement of 0.603 miles of Route 24 in City of Independence from Wilson Road to 400 feet West of Sterling Avenue. The corridor improvements include offset intersections modification, sidewalks, shared use path, asphalt pavement, upgrading drainage, adding lighting, and signal replacements. The consultant will be responsible for additional survey tasks required to provide professional, technical and all other things necessary for preparing preliminary plan, right of way plan, final plan and PS&E package in time for Summer 2024 letting. In addition to the final design activities the consultant will be responsible for submitting RER at each project milestone, providing displays/layouts and information for utitlity clearance, right-of-way acquisition and a public meeting. The consultant will provide project support during the construction phase to help answer questions or evaluate value engineering proposals. The method of contractor selection has not been determined at this time. MODOT - RFP Engineering - 24 Highway Complete Streets Phase 3

Conceptual

Roads / Highways

$1,600,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
69
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

Project location map

US-24, Independence, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.