BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Seattle, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Replacing expansion joints, full depth concrete pavement panel replacement, full width concrete pavement diamond grinding, hot mix asphalt paving, replacing ITS loops, pvmt markings, temp erosion control, traffic control and other work. Involves 52 items and 270 working days. Work class 5 or 47. WADOT - I-5/Duwamish River to S Lucile St - Concrete Rehab and Expansion Joints A state funded contract with a 5% condition of award small business enterprise goal and a 3% condition of award veteran-owned business goal.

Bid Results

Roads / Highways

$37,397,513.00

Public - State/Provincial

Paving, Site Work

312

8

4

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
106
Bidding Soon
1,755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

March 13, 2023

Project location map

I-5, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.