BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hollidaysburg, Pennsylvania. Completed plans call for site work for a water / sewer project.

The projects include streambank restoration work at four different locations: NatureWorksPark - Hollidaysburg Borough and Cross Keys Village, Maple Hollow Townhouses ,and Yohn Property - Allegheny Township. Details and designs for each project will be included in the BID documents. Said bids will be accepted for review and awarded or rejected at the board meeting of the Blair County Conservation District on March 21, 2022 at 7:30 pm local time at the same location. No responsibility will be attached to any District representative for premature opening of a bid not properly addressed and identified. All projects included in the bid must be entirely and adequately completed by July 31, 2022. Notice to proceed will be given following the bid award and work should be completed during periods of low stream flow. Due to the funding sources provided for these projects, each successful bidder will be required to comply with the Prevailing Minimum Wage of PA Department of Labor and Industry, (Act 422 of 1961, P.L. 987 amended) and/or Davis-Bacon Act (40 USC 276a to a-7) as supplemented by Department of Labor regulations (29 CFR, Part 5). The successful bidder will be required to execute contract documents. Evidence of insurance coverage as described in the bid documents must be furnished prior to issuance of a contract and the commencement of work. The District reserves the right to postpone or cancel receipt of bids, and to accept or reject any and all bids, in whole or in part of the best interest of the District will be served thereby. These projects are funded in part by Pennsylvania Department of Community and Economic Development and the National Fish and Wildlife Foundation. For more information Contact Blair County Conservation District Beth Futrick, Resource Coordinator

Award

Water / Sewer

$76,842.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
37
Bidding Soon
542
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2022

June 15, 2022

img_map_placeholder

Multiple Locations, Hollidaysburg, PA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.