Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2024 at 8:00 PM
Updated May 4, 2024
Site work for a water / sewer project in Hollidaysburg, Pennsylvania. Completed plans call for site work for a water / sewer project.
Ritchey Property Streambank Stabilization Project The project must begin on June 24, 2024, and must be entirely and adequately completed by July 24, 2024. Each successful bidder will be required to comply with the Prevailing Minimum Wage of PA Department of Labor and Industry, (Act 422 of 1961, P.L. 987 amended). The successful bidder will be required to execute contract documents. Evidence of insurance coverage as described in the bid documents must be furnished prior to issuance of a contract and the commencement of work. The District reserves the right to postpone or cancel receipt of bids, and to accept or reject any and all bids, in whole or in part of the best interest of the District will be served thereby. PROJECT DETAILS: Ritchey Property Streambank Stabilization Project is located at: Work Area 1: 40.429356, -78.437540 ( East off Route 764/US HWY 22) Work Area 2: 40.430554, -78.441077 (West off Route 764/US HWY 22) Work Area 3: 40.432318, -78.447772 (South off Mill Road, Duncansville, PA) Brief description of work includes: Log vane deflectors (multi log and single log), log framed stone deflectors, modified mudsill structures (one, two, three, five, and six sections), rock grade controls, randomly placed instream boulders, toe logs, cross logs, modified mudsills and log framed stone deflectors with extended sills, sawtooth deflectors, log cross vanes, and a rock cross vane. Brush material removed shall be taken off site for disposal. The Duncansville Research and Development Facility or other off-site disposals would be suitable locations for disposal Work for the project must begin and end as stated in the above Work Performance Timeframe, upon Execution of Agreement, unless stream conditions do not allow as determined by BCCD Staff and/or Trout Unlimited Staff. Project must be completed by July 24th, 2024.
Award
Water / Sewer
$89,886.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2024
June 24, 2024
To Be Determined, Hollidaysburg, PA
Related To This Project
Hollidaysburg, PA
Bid Date: Apr 03 2024
Hollidaysburg, PA
Bid Date: Apr 23 2024
Hollidaysburg, PA
Bid Date: Jun 11 2024
Hollidaysburg, PA
Bid Date: Jun 24 2024
Hollidaysburg, PA
Bid Date: Jul 11 2024
Hollidaysburg, PA
Bid Date: Sep 10 2024
Hollidaysburg, PA
Bid Date: Aug 23 2024
Hollidaysburg, PA
Bid Date: Nov 25 2024
Hollidaysburg, PA
Bid Date: Feb 01 2024
Hollidaysburg, PA
Bid Date: Oct 30 2023
Hollidaysburg, PA
Bid Date: Oct 13 2023
Hollidaysburg, PA
Bid Date: Oct 27 2023
Hollidaysburg, PA
Bid Date: Sep 30 2022
Hollidaysburg, PA
Bid Date: Mar 07 2022
Hollidaysburg, PA
Bid Date: Jan 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
