BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Reno, Nevada. Completed plans call for the renovation of a educational facility.

To remove wallpaper, then primer, texture and paint the walls in the hallways of the Sierra Building on the TMCC Dandini Campus. Work is to be performed during the summer break between May 17, 2022 - August 22, 2022 as coordinated with TMCC. Labor Commissioner #: WA-2022-179 Estimated Cost Range: $200,000 - $300,000 Liquidated Damages: $500/day Special Considerations: This project will be coordinated with TMCC to minimize summer class disruptions Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, and Workers' Compensation will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information. Completion of Work: Subject to change by Owner, Work shall be fully complete by "August 22, 2022". 3/3/2022 05:00:00 PM (PT) Questions Due Date Questions regarding this solicitation must be in writing and submitted via the Questions Tab for this bid by the Activity Date posted via this website. 3/7/2022 05:00:00 PM (PT) Answers Due Date All questions submitted prior to the Activity Date cut-off will be answered by the Activity Date posted via this website. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Wallcovering to be removed. The wall shall be primed and textured to a light orange peel. Joints that have visual cracks should be filled prior to painting. Fastener holes and other blemishes should be repaired prior to painting. Painting Scope will be Floor to Ceiling on 1st Floor. Floor to approximate 10 height of walls on the 2nd floor. Stairs and stairwell to be painted floor to ceiling. Handrails and window trim to be painted. Door frames to be painted fully in hallway through room. This work will be completed in conjunction with new flooring.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
33
Bidding Soon
385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

May 17, 2022

Project location map

7000 Dandini Blvd, Reno, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.