BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Porterville, California. Completed plans call for site work for a water / sewer project.

Awarded Company - 99 Pipeline, Inc, Porterville, California $2,123,011 For furnishing to said City all labor, materials, equipment, transportation, and services for the construction of sewer mains, sewer laterals, manholes, cleanouts and appurtenances serving annexation areas 479. All addenda and correspondence during the bid process will be handled electronically through the Public Purchase website. No bid shall be received from a non-official Bidder who has not registered and accessed the proposal documents from the Public Purchase website. A Certified Check, Cashiers Check, or Bidders Bond in the amount of ten percent (10%) of the bid made payable to the City of Porterville will be required to accompany each proposal. Any contract entered into pursuant to this notice will incorporate only the applicable provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at City of Porterville address and available from the California Department of Industrial Relations Internet web site Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations, are referenced but not printed in the general prevailing wage rates. Special attention is directed to Section 1720.9 of the Labor Code which now provides that the hauling and delivery of ready-mix concrete for a Public Works project is subject to prevailing wage rates and other related requirements. The Contractor shall have Eighty (80) working days Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, disability, gender, age, sexual orientation, or religion will also be required. No qualified disabled person shall, on the basis of disability, be excluded from participating in, be denied the benefits of, or otherwise be subject to discrimination. The City hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, disability, gender, age, sexual orientation, or religion in any consideration leading to the award of contract. No bid will be accepted from a Contractor who is not duly licensed in accordance with the provisions of Chapter 9, Division III, of the Business and Professions Code, and has a current Class A, General Engineering, State of California Contractor's license. The right is reserved by the City of Porterville to reject any or all bids, to evaluate the bids submitted and to award the contract according to the proposal which best serves the interests of said City. The successful bidder will be required to furnish the City of Porterville with a Performance Bond in the amount of one hundred percent (100%) of the contract and a Labor and Materials Bond in the amount of one hundred percent (100%) of the contract amount. Upon receiving the NOTICE OF AWARD, the successful bidder has TEN (10) DAYS to submit the signed contract together with all required bonds, insurance and licenses to the Project Manager, and meet with the City in a PRE-CONSTRUCTION MEETING to discuss any problems or questions pertaining to this project. It is the Contractor's responsibility to contact the Citys Project Manager immediately, to arrange for the PRE-CONSTRUCTION MEETING during the TEN (10) DAY PERIOD. The Contractor shall have Eighty (80) working days from the effective date of the NOTICE TO PROCEED to complete the required work. The Contractor shall pay the City LIQUIDATED DAMAGES in the amount of THREE THOUSAND DOLLARS ($3,000.00) a day for each calendar day the project is delayed beyond the "TIME OF COMPLETION DATE." The City will withhold five percent (5%) retention from payments due the Contractor until thirty-five (35) days after date of recordation of the Notice of Completion. The Contractor may elect to receive one hundred percent (100%) of payments due under the contract by depositing securities of equivalent value with the City in accordance with the provisions of the California Public Contract Code Section 22300. Such securities, if deposited by the Contractor, shall be valued by the City, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 22300 and Section 16430 of the California Government Code. A log of borings is contained in the appendix for use by the Contractor. It is intended to aid the Contractor in establishing the type of soils to be encountered but may or may not be indicative of all soil types to be found throughout the project limits.

Award

Water / Sewer

$2,123,011.00

Public - City

Site Work

18

13

4

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
23
Bidding Soon
351
All Active Projects
150
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2022

May 16, 2022

img_map_placeholder

Multiple Locations, Porterville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.