Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Crowley Lake, California. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.
Award Details Contract Award Date: Jan 13, 2023 Contract Award Number: 6982AF23C000013 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Herback General Engineering Contractor Awarded Address: Minden, NV 89423 USA Base and All Options Value (Total Contract Value): $31619345.04 THIS IS AN INVINTATION FOR BID, PLANS AND SPECIFICATIONS ARE AVAILABLE PROJECT NUMBER: CA FLAP 03S11(1), 6982AF22B000008 PROJECT NAME: Reds Meadow Road PROJECT DESCRIPTION: Reds Meadow Road is 8.3 miles long and provides the only access to several Inyo National Forest campgrounds, day use parking areas, trailheads, horse camp and equestrian facilities, Minaret Vista entrance station, Devils Postpile National Monument, and Reds Meadow Resort and Pack Station. The road begins at the intersection with Highway 203 at the Minaret Vista Entrance Station, continues along the side of the mountain and descends 2.5 miles into the valley, and then traverses the valley floor for 5.8 miles. The figure below provides a visual summary of the project location. The upper 2.5 miles of the road are a single lane with turnouts and it is experiencing pavement and fill slope failures in several locations. This portion of the project, Schedule A, will be reconstructed (4R) to include a widened bench to accommodate two lanes of traffic. The lower 5.8 miles of the road, Option X, currently supports two lane traffic and will be rehabilitated (3R). SCOPE OF THE WORK: The project consists of reconstructing and widening the upper 2.5 miles of road to a two-lane road. Widening will be accomplished in this section through the cut slopes, fill slopes, soil nail walls, reinforced soil slopes, and rock cuts. Guardrail will be constructed in select locations. The lower 5.8 miles of road will be rehabilitated through pulverization and repaving with a few areas of superelevation correction, the reconstruction of the entrance to the Devil's Postpile National Monument, and the excavation and or clearing of a few embankments to improve sight distance. The project involves a variety of work including excavation, rock excavation, soil nail walls, reinforced soil slopes, pipe culverts, guardrail, ditch reconditioning, drainage repairs, riprap, asphalt paving, full depth reclamation (pulverize and pave), erosion control, and revegetation. Items worth noting: Being the only access road to several recreation sites, Reds Meadow Road receives significant traffic during the summer months. Full closures during the daytime will not be allowed for the majority of the construction season. Maintenance of public traffic will be an important construction consideration. Daytime delays will be a maximum of 30 minutes. The project elevation is between 8,000 and 9,000 feet. The construction season will generally be May to October but will depend on weather. The project is in very steep, mountainous terrain, with a very narrow bench in the upper 2.5 mile portion of the project. Widening through the construction of soil nail walls, rock cuts, and reinforce soil fill slopes, will be difficult in this terrain. 14 soil nail walls with max heights ranging from 6 to 12 feet are proposed. Soil nails will be installed in hard rock that includes fractured areas, boulders, and zones of talus. A sculpted and colored concrete facing to blend with the surrounding geology will be required on the soil nail walls. Some rock excavation may require blasting. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 9,500 cubic yards of roadway embankment 26,000 cubic yards of reinforced soil slope 31,000 square feet of soil nail retaining wall 4,000 cubic yards of rock excavation 12,000 tons of roadway aggregate 22,000 tons of asphalt concrete pavement 5.8 miles of full depth reclamation 3,700 linear feet pipe culvert (15 to 36 inch diameter) 3,325 linear feet of guardrail 9,800 linear feet of asphalt curb ANTICIPATED SCHEDULE: Advertise: October 2022 Award: December 2022 Construction: Spring 2023 - Fall 2024 Note construction will be two seasons. May to approximately October in 2023 and 2024. ESTIMATED COST RANGE: The anticipated cost range is between $20,000,000 and $30,000,000. ESTIMATE START DATE 04/01/2023 10. ESTIMATED COMPLETION DATE 12/31/2024 TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON NOVEMBER 10, 2022 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data. For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive. FAX Number to submit modifications to bids for this project is (720) 963-3360 Email Address to submit modifications to bids for this project is cflcontracts@dot.gov II. POST AWARD INFORMATION CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor. Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency. FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1.5 million, is required to submit a subcontracting plan prior to contract award. The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of request of the CO, that bidder may be ineligible for award of the contract. Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration's Subcontracting Network (SUB-NET) so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net NOTICE TO BIDDERS A-iv fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts. A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FHWA Small Business Subcontracting Goals (As of FY 2022) Business Size Goal (%) SB 46.0% SDB 5.0% HUBZone 3.0% WOSB 5.0% SDVOSB 3.0%
Award
Roads / Highways
$31,619,345.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2022
April 1, 2023
Reds Mdw, Crowley Lake, CA
Related To This Project
Crowley Lake, CA
Bid Date: Jun 15 2022
San Diego, CA
Bid Date: Oct 31 2022
Sacramento, CA
Bid Date: Dec 14 2022
Highland, CA
Bid Date: Nov 15 2022
Lincoln, CA
Bid Date: Nov 10 2022
Santa Barbara, CA
Bid Date: Oct 25 2022
Kelseyville, CA
Bid Date: Nov 16 2022
Santa Barbara, CA
Bid Date: Oct 27 2022
Fresno, CA
Bid Date: Aug 30 2022
Cypress, CA
Bid Date: Oct 05 2022
San Diego, CA
Bid Date: Oct 31 2022
New York, CA
Bid Date: Sep 29 2022
San Jose, CA
Bid Date: Sep 16 2022
Eureka, CA
Bid Date: Nov 15 2022
Newport Beach, CA
Bid Date: Nov 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.