BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Castle Rock, Colorado. Completed plans call for site work for a municipal facility; for paving for a municipal facility; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 14, 2022 this project has not yet been awarded. The project is expected to be awarded around April 2022. The work to be performed under this contract includes removal/replacement of existing pavement including concrete and asphalt pavement, earthwork, crosspan, sidewalk, curb and gutter, ADA curb ramps, landscaping and irrigation, signing and striping, drainage inlets and storm drain, resetting traffic signals, and hot mix asphalt paving and patching. Contractor will be required to coordinate construction activities with trash removal companies, school district, HOA and Metro Districts if applicable. The Contractor shall supply all labor, materials and equipment necessary to complete the work in accordance with these specifications. The contractor shall commence work no later than ten (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within 170 calendar days from the date on the Notice to Proceed. If "Construction Completion" is not issued within the allotted contract time for the original scope of work, "Liquidated Damages" shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 25, 2022 and October 31, 2022. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of the Notice to Proceed and should not leave the project. General Requirements - Bid Deposit Required Job Location 4175 N. Castleton Court Castle Rock, Colorado United States 80109 Question Acceptance Deadline 02/28/2022 06:30 PM EST Questions are submitted online No

Bid Results

Roads / Highways

$4,224,475.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
52
Bidding Soon
948
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

April 25, 2022

img_map_placeholder

N Ridge Rd, Castle Rock, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.