BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Braceville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of September 15, 2022, project was awarded to Stott Contracting LLC, awarded amount is $531,556.50. The project is described as follows Installation of storm sewer along east side of Mitchell Street from East Huston Road to County Highway 53; removal and replacement of driveways and water services as needed; restoration of disturbed areas. The successful Bidder shall provide at least 50% of all labor required for the completion of this project. A certified check or bank draft, payable to the order of Village of Braceville, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent of the total Bid shall be submitted with each Bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Bidders are advised that wage rates for this Contract will be subject to the Davis-Bacon Act as defined by the United States Department of Labor. Bidders must be registered and must not appear on the debarment list, or be in the process of registering at the time of bid opening. Contracts cannot be awarded until registration is approved. Bidders are advised that the Illinois Steel Products Procurement Act (30 ILCS 565) is applicable to this project. The Village of Braceville reserves the right to reject any or all Bids or to waive any informalities in the bidding. Bids may be held by the Village of Braceville for a period not to exceed 90 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract.

Award

Water / Sewer

$531,557.00

Public - City

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
0
Bidding Soon
1,750
All Active Projects
789
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 5, 2022

img_map_placeholder

S Mitchell St, Braceville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.