Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Pepperell, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Fabrication of 1) a 16-foot-wide, 8-foot-high, 33.9-foot-long open-bottom precast concrete box culvert; 2) precast strip footings for the culvert; and 3) optional approach slabs for replacement of the Heald Street culvert over Sucker Brook in Pepperell, MA. Fabrication must be completed by 6/30/22 due to grant funding deadlines. Delivery/installation is anticipated around 7/20/22.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
851
Active Projects
403
Bidding Soon
5,739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2022

April 18, 2022

Project location map

Multiple Locations, Pepperell, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed