BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Edmonton, Alberta. Completed plans call for the renovation of a educational facility.

Work of this RFP package includes replacing the existing pneumatic controls on the VAV boxes and terminal reheat units in the NAIT U-Building with electronic controls connecting to the NAIT BMCS system. The replacement of the controls will be conducted in 2 phases to coincide with the changing occupancies of the building. Phase 1 will consist of the main floor of U Building and the second-floor offices/classrooms. Excluding the area of the on-campus Restaurant Ernest s. The Teaching area on the main floor has been already converted to electronic control (refer to points list for units that have already been converted to digital control) Phase 2 will consist of the on-campus Restaurant Ernest s, U210, U310 Library and the rest of the third floor of U Building. The Scope of Work includes, but is not limited to: Remove and dispose of the existing terminal boxes Supply and install new Direct Digital Controls (DDC), isolation valves and thermostats if required Remove and salvage for reinstallation or supply/install new ceiling panels and grid if required Patch and paint drywall bulkhead if required Majority of the work to be done after hours and weekends to prevent disruption to students and staff

Award

Educational

$440,013.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
29
Bidding Soon
524
All Active Projects
177
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 18, 2022

April 25, 2022

August 31, 2022

img_map_placeholder

11762 106 St, Edmonton, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.