Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a communication facility in Lake City, Colorado. Completed plans call for site work for a communication facility.
BLM-CO Communications Tower Reinforcement This is a solicitation to reinforce tower footings on Hill 71 (elevation 12000 feet) located near Lake City, Colorado . The tower was studied last year with the recommended and designer stamped reinforcement procedures described in the attachments. The work may required specialized skills and equipment. Access to the site is limited to high clearance 4WD with several steep water bars to cross. The Government estimates the rough order of magnitude for this project to between $25,000 and $100,000 with a budget toward the upper end of the scale. Site Visit: 3 June 2022 - 11:00 - at the site BLM-CO Communications Tower Reinforcement Basic Contracting Requirements: 1. Active Registration -www.sam.gov 2. Invoicing and Payment - www.ipp.gov 3. FAR Part 12 - Construction Provisions and Clauses 4. FAR Part 13 - Simplified Acquisition Procedures 5. Construction Wages for Hinsdale County, CO 6. Bonding - 20% bid bond, 100% performance and payment 7. Total Small Business Set Aside 8. Award Basis - Low Price Technically Acceptable Instructions: Please update your marketing literature with your new SAM Unique Entity Identifier (UEI). It has already been assigned to you if you had an existing registration in SAM.Gov. To find it just log in to SAM and note your new 12 alpha-numeric ID. Starting from April 4th, the SAM UEI is the ONLY identifier the Federal Government uses to identify you in our systems. Your DUNS number was deleted from our systems and is no longer used for Federal Business. Contact me if you have questions about that or anything else related to the Federal Procurement process or setting up your filters and notifications in www.sam.gov to get first hand info on contracting opportunities. Minimum Requirements for a Responsive Quote: 1. Signed, dated and filled out SF1442 with your prices filled in and on Schedule B. Acknowledge all amendments. 2. Technical response detailing your plan of actions, resources, capabilities, supervision, personnel, equipment and safety plan for accomplishing this work. A generic response without details will most likely be deemed technically unacceptable. Include at least three recent and relevant contactable references who are willing to attest to your technical capability in performing this work. 3. Bid Bond - 20% of quote 4. Email the above items to the POC no later than than the solicitation response date. POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038 ---- Delivery: 09/30/2022 Delivery Location Code: 0004276316 BLM-CO COLORADO STATE OFFICE* 2850 YOUNGFIELD STREET LAKEWOOD CO 80215 US Period of Performance: 07/18/2022 to 09/30/2022 00010 Hill 71 Tower Footings Product/Service Code: Y1PZ Product/Service Description: CONSTRUCTION OF OTHER NON-BUILDING FACILITIES REMINDER: All invoices must be submitted directly to www.ipp.gov and include an itemized matching attachment, certified payroll, certification for progress payments and a release of claims for the final invoice. The attached invoice must display the Purchase Order number, your invoice number, vendor name and address and the overall invoice amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Communication
$53,200.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2022
July 18, 2022
To Be Determined, Lake City, CO
Related To This Project
Lake City, CO
Bid Date: Jul 28 2023
Lake City, CO
Bid Date: Sep 11 2024
Lake City, CO
--
Salida, CO
--
Byers, CO
--
Estes Park, CO
--
Aurora, CO
Bid Date: Jul 07 2022
Keystone, CO
Bid Date: Jun 09 2022
Montrose, CO
Bid Date: Mar 08 2023
Aurora, CO
--
Fort Collins, CO
Bid Date: May 27 2022
Frisco, CO
Bid Date: Jun 03 2022
Evans, CO
Bid Date: Jun 01 2022
Denver, CO
--
Fort Collins, CO
Bid Date: Jun 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.