BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milton, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and bridge / tunnel.

Counties: Escambia Road Name: Sr 8 (I-10) Limits: Escambia County Welcome Center Project(s): 44159315201(*) Federal Aid No: D320048B Project(s): 44159315202 Federal Aid No: N/A Total Roadway Length: 0.606 Miles Contract Days: 300 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.606 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Calander Days The improvements under this contract, FPID # 441593-1-52-01, consists of milling and resurfacing portions of the exit and entrance ramps with asphalt pavement and replacing the existing perimeter wildlife fence at the SR 8 (I-10) Escambia County Welcome Center. Work also to be completed will be under FPID # 441593-1-52-02, consisting of reconstructing the existing semitruck and car parking areas with concrete pavement. Additional improvements consist of new signing and pavement markings, construction of windshield washer stations for both passenger vehicles and semi-trucks, utility work and adjustments, drainage modifications, construction of edge drain, removal and reconstruction of curb & gutter and sidewalks, reconstruction of the existing stormwater management facility (SWMF) to increase the overall footprint to include modifications to existing outfall structure, and removal and replacement of new subterranean node vehicle sensors within the existing truck stalls. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 015 Resurfacing/Concrete Pavement/Base Work/Drainage Improvements

Award

Roads / Highways

$6,499,662.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
479
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

April 8, 2022

img_map_placeholder

FL-8, Milton, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.