BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, asbestos abatement and renovation of an educational facility in Florence, Oregon. Completed plans call for asbestos abatement for a educational facility; for the demolition of a educational facility; for the renovation of a 10,910-square-foot, one-story above grade educational facility; and 4,995-square-foot, one-story above grade educational facility.

*UPDATE: Lease Crutcher Lewis will not be participating in the competitive bid process for demolition. Please see revised submission instructions.* Please submit all wood framing, insulation, and seismic work bids to: Joshua Dodson, Owner Construction Manager, at joshuadodson@otak.com Please submit all demolition and standing seam metal roofing bids to: Toan Vo, CM/GC Project Manager, at toan.vo@lewisbuilds.com and CC: Tanner Perrine at tanner.perrine@lewisbuilds.com Email subject must be clearly marked "LCC Florence Bid Package #2" Terms and conditions of the bid are outlined in Lease Crutcher Lewis, LLC (CM/GC) forthcoming "Invitation to Bid" attached to and made a part of the Contract Documents. Please reach out to us and inquire if you need alternate method of sending in our bids. Bids will not be accepted after bidding close time. Email time stamp will be used as official time of submission. ALL PROJECT QUESTIONS WILL BE DIRECTED TO: Toan Vo, CM/GC Project Manager at toan.vo@lewisbuilds.com Anticipated Project Start: April 2022 Anticipated Completion: December 2022 Substitution Requests are due by March 4, 2022, at 5:00pm per the request process outlined in the specifications. All Questions for the project are due by March 7, 2022, at 5:00pm. The total building renovation costs is projected to be approximately $7 Million. The project consists of renovation of the existing 17,426 SF one story campus building. Campus consists of three (3) separate buildings. Building A: 10,910 SF BUILDING B: 4,995 BUILDING C: 1,080 SF. Construction of the buildings are wood framed, on continuous and spread footings and partially supported on concrete slab on grade. Work will include - BLDG A: Interior space renovations, new mechanical mezzanines, storage, seismic upgrades, complete demo, window replacement, reclad of exterior finishes including roofing, new domestic and fire water lines to support new fire protection system. New Mechanical System complete with DDC Controls, New Plumbing infrastructure, new lighting throughout and electrical work to support upgrades. BLDG B: Exterior Paint, New Roofing (Alternate), Mechanical Equipment upgrade utilizing existing ductwork and new lighting throughout. BLDG C - No work. BLDG A will be partially occupied in the Spring of 2022 and Fall of 2022 BLDG B will be occupied for the duration of the project. The project site is located at: The Project Site is located at, 3149 Oak Street Florence, OR 97439. PLANS & SPECIFICATIONS Lane Community College - Florence Center Upgrades, dated 02/11/22 by woofter bolch architecture. 106 pages. Lane Community College - Florence Center Specifications VOLUME 1 & 2 dated 2/11/22 by woofter bolch architecture. Volume 1 is 636 Pages; Volume 2 is 588 pages. Lane Community College - Florence Center Hazardous Building Materials Survey Report, dated December 2021 by PBS. 56 pages. Contract Documents and the Invitation to Bid may be reviewed at the following locations Starting February 25, 2022 by EOD: 1) Building Connected by Invitation. OR: 2) Lewisbuilds.com >Click on Contact >Bid Opportunities to Join Building Connected to view the Bid Package. Proposers must comply with the following requirements: Licensed with Construction Contractors Board ORS 671.530, Resident Status ORS 279A.120.

Post-Bid

Educational

$1,700,000.00

Public - City

Asbestos Abatement, Demolition, Renovation, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
12
Bidding Soon
151
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

April 1, 2022

img_map_placeholder

3149 Oak St, Florence, OR


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.