Published July 29, 2022 at 8:00 PM

Updated November 14, 2023

Site work, paving and new construction of a civil project in Homer, Georgia. Completed plans call for the construction of a road / highway; for site work for a road / highway; for paving for a road / highway; water / sewer project; and road / highway.

As of June 20, 2022.The project has not yet awarded. Estimated budget $17,000,000-18,000,000 The Owner will only accept bids from contractors that have been prequalified. SCOPE OF WORK: The project consists of, but is not limited to, the following major elements: Bidder agrees to furnish all materials and equipment and to perform all labor necessary to construct the Hudson River Water Reclamation Facility as shown on the attached Overall Site Plan, and as detailed in the below table entitled Table 1. Please be advised that the complete set of Drawings will be released to all prequalified contractors on April 20, 2022. The work shall include, but not be limited to, a raw sewage pump station, plant pump station, headworks with a mechanical screen and grit separator, two (2) Sequencing Batch Reactors, a post - equalization basin, a concrete structure to house a future sequencing batch reactor, tertiary disc filters, a chlorine contact chamber, an effluent structure with a low-profile cascade aerator and metering flume, an aerobic digester, a concrete structure to house a future aerobic digester, a sludge dewatering building, a bulk chemical storage structure, a chemical feed building, a blower/electrical building, a control building, instrumentation, on-site generators, electrical, and SCADA. The work also includes, but is not limited to, clearing and grubbing, earthwork, site work, yard piping, stormwater piping, asphalt and gravel roads, erosion and sediment control measures, grassing, construction staking, mobilization/demobilization, bonds, insurance delivery of materials, taxes, and all other appurtenances necessary for completion of the Work. Time allotted for completion of work is 720 calendar days from the date of a written Notice to Proceed from Owner. The Work, if awarded, will be awarded in one (1) Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$23,047,512.00

Public - County

New Construction, Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
107
Bidding Soon
2,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

September 15, 2022

Project location map

To Be Determined, Homer, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.