BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, new construction and renovation of a mixed-use development in Rancho Cordova, California. Conceptual plans call for the construction of a 14,900-square-foot warehouse / distribution facility; for the renovation of a 7,075-square-foot medical facility; for site work for a medical facility; 5,921-square-foot medical facility; and for the demolition of a medical facility.

The scope of this project is the following infrastructure improvements to the Veterans Affairs Northern California Health Care System (VANCHCS):A A/E Part One - (also known as Design Phase) for this design project includes site visits, field investigation, studies, and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to renovate for Sterile Processing and Covid-19/Clean Storage Design at the Northern California Health Care System (VANCHCS) located in Mather, CA. The project shall include, but is not limited to, 21,321 square feet (sf) of new construction (14,900 sf new warehouse storage; 5,921 sf mezzanine; 500 sf connecting bridge); and 7,075 square feet of renovation (6,075 sf Sterile Processing & 1,000 sf Clean Storage). The existing warehouse Building 652 at the medical center will become home for sterile processing, expanded biomedical support and clean storage functions. These functions are significantly undersized given the increased demand for equipment, sterile processing, and storage. Project will construct a 5,921 square foot mezzanine within Building 652 with a 500 square foot connecting bridge to surgery in Building 700 totaling 6,421 square feet. Project also converts 7,075 square feet of warehouse space to Sterile Processing and Supply (SPS) and Clean Storage. To make room for new construction, project will demolish, replace, and right size an existing non-ADA compliant 1,589 square foot mezzanine inside of Building 652 for Biomedical Maintenance and Emergency Cache for pandemic response. The bridge between Buildings 652 and 700 will provide direct access for SPS to the Operating Rooms. Project will correct over $175,000 in facility condition and physical security (PSDM) deficiencies. This new warehouse space will also allow for the disposal of the Sacramento Warehouse lease, a 9,900 square foot lease that is about to activate (SCIP Project VHA21-612-2015-30612). New lease is not yet operational in the Capital Asset Inventory; therefore, it cannot be selected for disposal under the SCIP Asset tab. Project also includes two parking spaces with electric chargers for GSA plug-in hybrid vehicles. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Medical

$20,000,000.00

Public - Federal

Demolition, New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
82
Bidding Soon
1,514
All Active Projects
628
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

img_map_placeholder

10535 Hospital Way, Rancho Cordova, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.