BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in West Palm Beach, Florida. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The respondents will be submitting proposals to provide Construction Management at Risk services consisting of pre-construction services, developing a Guaranteed Maximum Price (GMP), and construction of the following projects: Fire Station (FS) 49, located at the southwest corner of Flavor Pict and Lyons Road in Boynton Beach, FS 24 located at 2700 Westgate Avenue in West Palm Beach and FS 92 located at 4575 Lyons Road Lake Worth (the "Project"). The Project includes, but is not limited to: the construction of an approximately 17,747 square foot Fire Station (FS 49), construction of an approximately 12,750 square foot Fire Station (FS 24), and construction of an approximately 15,700 square foot Fire Station (FS 92). The three referenced Fire Station projects are to include all associated site work, utilities, paving, drainage, site lighting, signalization infrastructure, landscape and irrigation. The preliminary construction cost is estimated at $8,000,000 for FS 49, $5,700,000 for FS 24 and $7,000,000 for FS 92. The total cost of construction is estimated to be $ 20,700,000. All conditions and requirements for submittal of proposals are contained in the RFP. Equal Business Opportunity Program. Pursuant to the Palm Beach County Code Section 2-80.20 2-80.40 (EBO Ordinance), the County will provide contracting and subcontracting opportunities for S/M/WBEs. Responses will be evaluated based on the selection criteria set out in the RFP including the Affirmative Procurement Initiatives (APIs) determined by the County's Goal Setting Committee. The APIs for this solicitation are: SBE Evaluation Preference for Mentoring: 5 points for CM/SBE Partner SBE Evaluation Preference for SBE Participation: up to 10 points for SBE Participation Plan The APIs applicable to the construction phase of this project, including any mandatory SBE or M/WBE goal(s) for the construction subcontracts, will be determined by the County's Goal Setting Committee prior to each Guaranteed Maximum Price Amendment. It is anticipated that at least a mandatory minimum SBE subcontracting goal of 20% will be applied to the construction phase(s) of this project. However, depending on the availability of S/M/WBEs at the time of subcontractor bidding, the County's Goal Setting Committee may apply a higher mandatory SBE subcontracting goal or may apply a mandatory M/WBE subcontracting goal. Proposers should review the RFP for more information on the County's EBO Program as it applies to the construction phase(s) of this project. At the time of proposal submission, respondent must be properly certified and licensed in the State of Florida and/or Palm Beach County, as applicable, for the purpose of performing the specified work. Palm Beach County reserves the right to waive any proposal irregularities, informalities, or technical deficiencies and to reject any and all proposals. The preliminary construction cost is estimated at $8,000,000 for FS 49, $5,700,000 for FS 24 and $7,000,000 for FS 92. The total cost of construction is estimated to be $ 20,700,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Fire / Police

$20,700,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
54
Bidding Soon
1,130
All Active Projects
514
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, West Palm Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.