BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Whiting, Wisconsin. Completed plans call for site work for a road / highway.

The Village of Whiting is inviting bids for the installation of roadway drainage swales in the areas highlighted on the attached project map. All of the shallow drainage swales are to be cut and sloped to a maximum depth of 12 inches lower than the edge of the finished road. The Director of Public Works reserves the right to slightly alter the depths of swales as needed based on the slope and topography of the project area. The drainage swale should then be finished with 2 to 3 inches of screened topsoil, seeded, and mulched. Alternatively, a separate bid line for hydroseeding costs is requested. The Village will determine what finishing method will be utilized after the review of the bids. Additionally, the contractor will be responsible for placing black dirt "backing" where curbs have been installed after the completion of the curbs. Seeding of these areas will be required as part of the project. Questions regarding the project can be addressed by the Director of Public works at (715) 340-7582. The Village of Whiting will be responsible for marking road right-of-ways as well as tree/brush/branch removal as necessary. The Village of Whiting will also be responsible for the adjustment of water valves and manholes present in the proposed project area. The contractor will be responsible for removal of any stumps present in the right-of-way where swales are being installed. The contractor is responsible for any damage to streets, edge of streets, pavement markings, signage, shoulders and driveways. Additionally, the contractor is responsible for damage to private property including, but not limited to, landscaping, amenities, irrigation systems, yard lights etc. on private property adjacent to the right-of-way during the duration of the project. Utility locates, both public and private, are the responsibility of the contractor. Project will be completed in a timely fashion that allows for new vegetation to become established before winter. The Village reserves the right to reject any and all bids, to waive irregularities and informalities therein, and further reserves the right to award the contract to the best interests of the Village of Whiting. Bid Results:- 1. Reconstruction of Locust and Rose Street - American Asphalt - $128,466 2. Swale Installation - Green Thumb- $17,085 3. Black Dirt and Hydroseed - Green Thumb - $22,486 4. Reconstruction of Strange Street -American Asphalt -$88,860

Award

Roads / Highways

$256,897.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
15
Bidding Soon
249
All Active Projects
106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2022

April 21, 2022

img_map_placeholder

Multiple Locations, Whiting, WI


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.