BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hazleton, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of December 2, 2022, the project has been awarded. A timeline for construction has not been confirmed. CLARIFICATION DEADLINE 5/27/2022 4:00 PM A certified check or bid bond drawn to the order of the Hazleton City Authority - Water Department in an amount equal to ten percent (10%) of the bid must be submitted with each proposal as bid security and received at the Authority's Office with all other required bid documents prior to the Bid Opening. Bidders shall comply with all procedures and requirements of the Contract Documents. The HCA encourage DBEs, including MBEs and WBEs, to submit a bid proposal. All Prime and subcontractors shall make the required good faith efforts when subcontracting and shall provide all documents to substantiate their search prior to award. Prior to the award of any Contract, the successful bidder shall furnish to the Owner Certificates of Insurance, Performance Bond, Labor and Material Payment Bond, American Steel certifications, DBE/WBE Compliance Documents, and any other items as required by the Contract Documents. The Hazleton City Authority - Water Department hereby reserves the right in its discretion, which is understood and agreed to by all bidders, to reject any and all bids submitted, and also reserves the right to waive any irregularities, omissions, mistakes, or informality in the Bidding Process. Anticipated Award and Construction Dates: a. Bid Award: June 7, 2022 b. Contract Signing: June 24, 2022 c. Pre-Construction Meeting: September 8, 2022 d. On-Site Work Commencement Date: September 12, 2022 e. Substantial Completion: March 5, 2024 f. Final Completion: September 1, 2024 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,260,000.00

Public - City

Site Work

203

27

87

3

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
98
Bidding Soon
1,534
All Active Projects
715
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

August 1, 2022

img_map_placeholder

PA-940, Hazleton, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.