BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a transportation facility in Faribault, Minnesota. Completed plans call for outdoor lighting for a transportation facility; and for site work for a transportation facility.

Faribault municipal airport airfield lighting improvements Number item units quantity 10-l-101 l-801a, class 2, led beacon replacement on existing beacon tower each 1.00 11-l-125 replace existing runway end indicator lights (reils) with led reils on existing foundation each 2.00 1-l-125 electrical demolition lump sum 1.00 2-l-108 no. 8 awg, 5kv, l-824c cable, installed in existing conduit lin ft 10,000.00 4-l-125 l-861 led medium intensity runway edge light and isolation transformer. Installed in existing base can each 42.00 5-l-125 l-861e led medium intensity runway end, runway threshold light and isolation transformer. Installed in existing base can each 22.00 6-l-125 l-861t led medium intensity taxiway edge light and isolation transformer. Installed in existing base can each 58.00 9-l-125 install owner supplied led power upgrade kit in flat face size 2 airfield sign each 7.00 Project start date:09/29/2022 Construction start date:09/29/2022 Construction end date:11/04/2022

Award

Transportation Terminals

$263,757.00

Public - City

Outdoor Lighting, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
45
Bidding Soon
768
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

September 29, 2022

img_map_placeholder

3401 MN-21, Faribault, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.