Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Edmonds, Washington. Completed plans call for site work for a water / sewer project.
The 2020 Water Main Replacement portion of the project involves the replacement of existing water main in three locations with roughly 2,450 lineal feet (LF) of 8" Ductile Iron (DI) pipe in the Twin Maples neighborhood, 490 LF of 8" pipe in Woodhaven Place, and 300 LF of 8" DI as well as 120 LF of 4" pipe in 95th Place W. The project that is located in Snohomish County also includes the replacement of fire hydrants and blow-off assemblies, connections to the existing system, and replacement and reconnection of services. Also included as part of the work is restoration work involving trench patching, grind and overlay, general restoration, as well as erosion control and traffic control. The specific location of the proposed facilities to be replaced is shown on the construction plans. The watermain portion of the project is funded through the Washington State Public Works Board program with State funds. The Engineer's Estimate (without tax) for the water main replacement portion of the project without tax is $1,225,000.00. The bioretention retrofit portion of project includes work in the Twin Maples Neighborhood in the Town of Woodway on 111th Place West and 239th Place Southwest. The bid schedule consists of Bioretention Retrofit that include installation of two (2) raingardens, one (1) concrete drainage structure and associated storm drainage piping. Included are associated temporary erosion and sediment control measures, tree/landscaping removal, asphalt removal, and restoration of landscaped and paved areas. Restoration of landscaped areas includes gravel shoulders and hydroseeding. Contractor shall also provide traffic control in accordance with the MUTCD. All work shall be performed in accordance with contract documents and approved construction plans. The Engineer's Estimate for this portion of the project is $55,000.00 (no tax).
Post-Bid
Water / Sewer
$1,280,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2022
May 27, 2022
Multiple Locations, Edmonds, WA
Related To This Project
Edmonds, WA
--
Edmonds, WA
Bid Date: Apr 21 2022
Edmonds, WA
Bid Date: May 05 2022
Edmonds, WA
--
Edmonds, WA
--
Edmonds, WA
Bid Date: Jun 17 2022
Edmonds, WA
Bid Date: Jul 14 2022
Edmonds, WA
Bid Date: May 13 2022
Edmonds, WA
Bid Date: Mar 15 2022
Edmonds, WA
Bid Date: Apr 19 2022
Edmonds, WA
Bid Date: Apr 21 2022
Edmonds, WA
Bid Date: Apr 20 2022
Edmonds, WA
Bid Date: May 04 2022
Edmonds, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.