Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, new construction and renovation of a mixed-use development in Brooksville, Florida. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; for the renovation of a pre-engineered storage facility; for site work for a pre-engineered storage facility; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

As of June 1, 2022, this project has not yet been awarded. A timeline for award has not yet been established. This project is for the demolition and remove the existing building, and replacing it with a new pre-fab metal building, ensuring a secure and safe environment for staff, equipment, and electrical components. This would include replacement of the existing generator with a 250 kilowatt generator, all electrical wiring, breakers, transfer switches and related components. Proposed upgrades would also include a new testing laboratory with professional cabinetry, sink, and metering equipment for testing and analyzing water samples to demolish and remove the existing building, and replacing it with a new pre-fab metal building, ensuring a secure and safe environment for staff, equipment, and electrical components. This would include replacement of the existing generator with a 250 kilowatt generator all electrical wiring, breakers, transfer switches and related components. Proposed upgrades would also include a new testing laboratory with professional cabinetry, sink, and metering equipment for testing and analyzing water samples. Question Acceptance Deadline 03/18/2022 05:00 PM EDT Questions are submitted online Yes General Requirements - Bid Deposit Required - Insurance Required - Installation Required - License Required - Safety Standards Plan - Bid Bond 5 %

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$323,500.00

Public - City

Demolition, New Construction, Renovation, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
145
Bidding Soon
2,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 13, 2022

Project location map

Lamar Ave, Brooksville, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed