Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
This project contains a .dwg fiile, please see owner for more information Question Acceptance Deadline 03/24/2022 05:00 PM EDT Questions are submitted online No Buyer's Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond Shall be no later than ninety (90) days plus ten (10) daysfor mobilization in accordance with the terms and conditions of this Agreement. 5 % - Performance Bond 100 % - Payment Bond 100 % The Utah Park - Sidewalk and Bridge Abutment Repairs project involves repairs to a concrete walkway and bridge abutments that have been displaced as the result of normal storm water conveyance within the park. Work performed includes but is not limited to supply and installation of the following: Earthwork/Minor Grading Site Preparation and Demolition Protection of Existing Trees Erosion & Sedimentation Control Riprap and Boulder Installation Drainage Pipe, Inlet, and Cleanout Installation Concrete Sidewalk and Abutment Replacements TREX Decking including Caissons TREX Benches Pedestrian Traffic Control Sod, Native Seed and Soil Preparation Irrigation Repairs Work not specifically called out for but is needed to accomplish a successful project under this contract should be considered as part of the work to be performed, whether specifically detailed or not. Bids Will Be Read Aloud Thirty (30) Minutes After The Bid Closing. This Event Will Be Held Online Using WebEx. Interested Parties May Join The Event Using Any Of The Following Options: Join From The Meeting Link Https://auroragov.webex.com/auroragov/j.phpMTID=m3cc26102597f6a088036422ab7b03d27 Join By Meeting Number Meeting Number (access Code): 2492 596 9640 Meeting Password: PDbPQxZ9W74 Join By Phone +1-408-418-9388 United States Toll The estimated cost for this project is from $300,000.00 to $335,000.00.
Bid Results
Bridges / Tunnels
$418,898.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2022
May 6, 2022
Multiple Locations, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Apr 19 2022
Aurora, CO
Bid Date: Apr 01 2022
Aurora, CO
Bid Date: May 27 2022
Aurora, CO
Bid Date: Apr 21 2022
Aurora, CO
Bid Date: Jun 02 2022
Aurora, CO
Bid Date: May 25 2022
Aurora, CO
--
Aurora, CO
Bid Date: Apr 28 2022
Aurora, CO
Bid Date: Dec 31 2022
Aurora, CO
Bid Date: Feb 03 2022
Aurora, CO
Bid Date: Apr 01 2022
Aurora, CO
Bid Date: Apr 07 2022
Aurora, CO
Bid Date: Apr 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.