BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Red Bluff, California. Contact the soliciting agency for additional information.

The South Main Street Rehabilitation and Road Improvement Project (Project) is a single-phase project funded with local funding on South Main Street from Elm Street to Luther Road (approximately 1.1 miles). South Main Street Rehabilitation and Road Improvement Project consists of cold planing and placing rubberized stress absorbing membrane interlayer and rubberized hot mix asphalt from Luther Road to Elm Street. Additional work includes replacing non-ADA compliant curb ramps with new compliant ramps, new pedestrian push buttons at signals, new detector loops at signals, and new striping. Bidding Contractor must be registered with the California Department of Industrial Relation (DIR) and pursuant to California SB 854, the Contractor and Subcontractors must submit certified payroll records to the Labor Commissioner. Pursuant to Section 1770 et. seq., California Labor Code, the successful bidder shall pay not less that the prevailing rate of per diem wages as determined by the DIR. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
21
Bidding Soon
253
All Active Projects
133
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 5, 2022

img_map_placeholder

S Main St, Red Bluff, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.