BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2022 at 8:00 PM

Updated November 14, 2023

Renovation of an educational facility in Long Beach, California. Conceptual plans call for the renovation of a educational facility.

The District is seeking the services of a firm to provide Labor Compliance Services the Drinking Fountain Replacement Phase 1 ESSER Funded Project. This is a federally funded ESSER Project. Davis Bacon or stricter wages apply. Preparation and assistance with pre-construction meetings and weekly construction meetings; interviewing workers on the job site; reviewing weekly work and certified payroll reports including review for correct worker classification, wage determination, and apprentices performing work for all contractors and subcontractors; and completion of project File Review and responding to all public records requests. Q&A Deadline 03/22/2022 2:00 PM (PDT) Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The method of Contractor Selection has not been Determined at this time

Conceptual

Educational

$150,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
3
Bidding Soon
2,280
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2023

Project location map

Multiple Locations, Long Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.