BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a sidewalk / parking lot in Summerville, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Contractor shall mill, clean, pave new, and stripe parking area at the project site, as specified. 1. Mill approximately 37,500 sq. ft. of existing asphalt - full depth removal at curbing. 2. Sweep and remove all debris for clean surface. 3. Tamp and re-compact the existing stone base to ensure a solid foundation for new asphalt. 4. Add new crushed stone as necessary. 5. Apply a tack coat to all edges to ensure the new asphalt properly binds. 6. Pave 2" of new asphalt to approximately 37,500 sq.ft. 7. Ensure compaction with a heavy roller. Roll surface course to achieve maximum density and a true, firm finish to match the existing grade. 8. Lay out and stripe all pavement markings using thermoplastic treatment to match existing layout. 9. Pricing for repair of curb damage incurred with milling, shall be per linear foot. 10. All work is to be scheduled to done on weekends or afterhours to limit service interruptions. 11. Perform utility surveying prior to beginning any work. Utility surveying shall be coordinated with the project manager

Bid Results

Sidewalks / Parking Lot

$117,630.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
78
Bidding Soon
1,106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 2, 2022

Project location map

320 Midland Pkwy, Summerville, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.