BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 1, 2022 at 8:00 PM

Updated October 24, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Witter Springs, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 1, 2022 , this project has not yet been awarded. The project is expected to be awarded on June 21, 2022. Replace a one-lane bridge with a two lane bridge. Salvage & deliver salvaged bridge to Lake County Road Dept. Bridge Replacement on existing alignment with approximately 430 feet of roadway reconstruction with HMA over AB. You must perform, place, construct, or install other items and details not mentioned that are required of the plans under the Standard Specifications and special provisions.

Bid Results

Bridges / Tunnels

$1,492,810.00

Public - County

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 13, 2022

Project location map

Witter Springs Rd, Witter Springs, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.