BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Nashville, Tennessee. Completed plans call for site work for a road / highway.

Guardrail Construction Maintenance and Repairs Scope Details Contractor(s) shall be responsible for providing all labor, tools, equipment, transportation, traffic control devices appurtenances, and materials, not specifically stated to be furnished by Metro, necessary for the removal, replacement, installation, and repair of guardrail, handrail and/or pedestrian safety rail. The cost of construction projects will be based on estimated quantities to complete the work and by using the line items unit price in the Construction contract. This work will be accomplished on an individual work order basis. The Contractor shall not be paid a mobilization cost for any work order. Specifications All repair work shall be done in accordance with the latest edition of MUTCD, the currently approved TDOT Standard Drawings for safety appurtenances, manufacturer's shop drawings, the latest edition of the Standard Specifications for Road and Bridge Construction with all its supplements and modifications of the current Special Provisions, or Metro Standard Drawings/Details and Specifications. All guardrail installations shall coincide with TDOT Guardrail Standards S-PL-1 Safety Plan at Roadside Hazards, latest edition. Earth pads installed in conjunction with tangential energy absorbing guardrail terminals shall be constructed per Standard Drawings S-GRT-2P and S-GRT-2R or as directed by the Engineer. Materials used in the replacement or repair of damaged guardrail shall conform to the requirements of Section 909 of the Standard Specifications. Materials used to construct earth pads for tangential energy absorbing guardrail terminals shall conform to the requirements of Sections 303 and 903.05 of the Standard Specifications. Where there is conflict between TDOT standard drawings and specifications and NDOT technical details and specifications, NDOT technical details and specifications shall govern. Additionally, the Contractor(s) shall be responsible for ensuring compliance with any other related sections in the specifications described above that are relevant to the requirements of completing projects under this contract or as directed by the Engineer. Minority Business Enterprise (MBE) Percentage Goal: 11 % Woman Business Enterprise (WBE) Percentage Goal: 10 % Pre-Offer Meeting A pre-offer meeting is not applicable for this solicitation. Bonds A Payment and Performance Bond is required for a contract award exceeding $100,000. The awarded firm(s) shall submit a Payment Bond and a Performance Bond as a condition precedent to a contract or purchase order basis per project. Documentation of bonds shall be in a format acceptable to Metro. Inquiries All inquiries must be submitted by Monday, May 23, 2022 at 2:00PM Central Time using the online discussions feature of the iSupplier system. Questions will be answered formally via Amendment to the solicitation soon after the deadline for submitting questions. Offerors must clearly understand that the only official answer or position of Metro will be the one stated in writing by Division of Procurement staff. You may contact Marissa Conklin at Marissa.conklin@nashville.gov with questions regarding iSupplier or you may email iSupplier@nashville.gov . All offerors are encouraged to sign in to the iSupplier system as soon as possible to view the solicitation and ensure all login information is correct. Finally, please have your offer loaded in the iSupplier system well in advance of the deadline for submission of offers to avoid any last minute functionality issues. While Metro makes every attempt to assist suppliers with entering their offers, there is not sufficient time to trouble shoot functionality issues within one hour of the deadline for submission of offers.

Post-Bid

Roads / Highways

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
26
Bidding Soon
715
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

December 5, 2022

img_map_placeholder

Multiple Locations, Nashville, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.