EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 16, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Nashville, Tennessee. Working plans call for site work for a water / sewer project.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. Payment Terms N30 Minority Business Enterprise (MBE) Percentage Goal: 3% Woman Business Enterprise (WBE) Percentage Goal: 3% Bonds A Payment and Performance Bond is required for a contract award exceeding $100,000. The awarded firm shall submit a Payment Bond and a Performance Bond as a condition precedent to a Contract or purchase order. Documentation of bonds shall be in a format acceptable to Metro. Timeframe (60 minutes max) - MWS to ask questions in rotation. All Proposer's will be asked the same questions. Failure to respond to a question will result in point deductions, therefore, Proposers are encouraged to be mindful of the time during the Question/Answer portion of the interview. Round 3 Offerors evaluated as qualified from Round 2 will be invited to the next round(s) wherein Offerors will submit Cost for a total of 100 Points Round 3 - Cost Evaluation Criteria (100 Points Maximum) For the purposes of evaluation, the project shall be assumed to have a conservative projected estimate for the construction of $140,000,000. The budgetary cost will be updated as the project progresses in design and engineering. The lowest evaluated cost will be awarded the maximum points, and other Proposers will receive points based on their cost in proportion to the lowest cost. If in the view of Metro, the information submitted is not reasonable, this may result in the rejection the proposal as non responsive or in a reduction of score, if, in the sole evaluation by Metro, the proposed hours or rates would not result in the best interests of Metro and the success of this project. If determined to be fair and reasonable by Metro, contractor-quoted fees and billing rates will be used as the basis for the contract and payment to the contractor. Proposers shall not submit unrealistically low values in order to obtain a more favorable rating from the Evaluation Panel. It is anticipated that the quoted fees and billing rates will be used as a basis for developing the Guaranteed Maximum Price (GMP) proposals by the CMAR. Points from Round 1, 2, and 3 be added together to determine who receives the max points.

Pre-Construction/Negotiated

Water / Sewer

$21,758,204.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
41
Bidding Soon
683
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2022

June 17, 2023

img_map_placeholder

1600 2nd Ave N, Nashville, TN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ Construction Manager at Risk - The Schrader, Benedict andCrutcher, and Boscobel Sewer Separation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.