BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Carol Stream, Illinois. Completed plans call for site work for a road / highway; and water / sewer project.

Klein Creek between Thunderbird Trail and Kuhn Road, approximately one mile northwest of the intersection between IL State Route 64 (North Ave) and DuPage County Highway 23 (Gary Avenue). Based on Village's 5 year Capital Improvement Program (FY23-FY27). The Village of Carol Stream, Illinois will receive Sealed Bids for a Public Works Construction contract that will restore and stabilize the eroded streambanks of approximately 3,600 linear feet of stream channel. A general description of the work involved is streambank excavation and re-shaping, including re-meandering to create new channel and "oxbow" areas, as well as constructing wetland areas. The stabilization measures to be installed include vegetated rock toe, in-stream rock substrate areas, stream barbs, toe wood with rock, and pre-cast modular retaining walls. The work will also involve clearing and tree removal, fence removal and installation, adjusting storm sewer outfalls, turf restoration, planting native vegetation, and performing maintenance and monitoring during establishment. An in-stream work plan will be required that addresses dewatering operations in order to construct "in the dry", including the discharge from the Village of Carol Stream's Water Reclamation Center. Est. Value:$ 3,500,000.00.

Award

Water / Sewer

$3,488,664.00

Public - City

Site Work

92

29

16

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
208
Bidding Soon
3,168
All Active Projects
1,436
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

June 27, 2022

img_map_placeholder

Klein Creek, Carol Stream, IL

Related To This Project


Find better leads. Win more business.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.