BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Carol Stream, Illinois. Completed plans call for site work for a bridge / tunnel; and road / highway.

**As of October 12, 2022, this project has been awarded to Alliance Contractors, Inc., in the amount of $452,315.31 City/County: Carol Stream Section No. 21-00066-00-MS Description: Safety Improvements to Design Retaining Walls, Guardrail, and Culvert Replacement. Proposed Improvements Will Include New Retaining Walls, New Guardrail, and New Culverts. The Purpose of the Project is to Provide Safety to Motorists With New Safety Features Including Wider Shoulders, Retaining Walls, Guardrail, and Barrier Terminal Sections. The Need for This Project is to Prevent Poor Existing Conditions From Causing Further Crashes, Damages, and Injury to Motorists. LOCATION OF PROJECT This project begins at a point along the projected centerline of Fair Oaks Road approximately 185 feet south of the centerline of Jason Court, at Station 99+62 and extends in a northerly direction for a distance of 512.5 feet (0.1 miles) to south of Riviera Court, at Station 104+74.5, approximately 125 feet south of Riviera Court. The project is within the Village of Carol Stream and Wayne Township Road District. The total project gross and net length is 512.5 feet (0.1 miles). ILDOT - Safety Improvements BID SECURITY: Bid security in the amount of not less than 5 percent (5%) of the Bid shall accompany each Bid in accordance with the Bidding Documents. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the Village for one-hundred percent (100%) of the Contract Price, in accordance with the requirements of the Contract Documents. Davis-Bacon Wage decisions are applicable to this project and are only superseded in instances by and where Illinois Prevailing Wages exceed Davis-Bacon in wage, fringe benefits, and/or trade stipulations (requirements). If this project does not start within ninety (90) days of contract award, the wage decisions applicable to the project shall be replaced with the Davis-Bacon Wage decisions that are current as of the date of contract award. Completion Date: JUNE 30, 2023

Award

Roads / Highways

$452,315.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
88
Bidding Soon
1,781
All Active Projects
768
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2022

November 21, 2022

img_map_placeholder

Fair Oaks Rd, Carol Stream, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.