EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Carol Stream, Illinois. Completed plans call for the renovation of a water / sewer project.

Construction of the Village of Carol Stream Wastewater Reclamation Center Diffuser Replacement Project, consisting of demolition and removal of the aeration basin diffusers and appurtenances in the six (6) existing aeration basins and four (4) existing aerobic digesters and installation of Owner-procured new diffusers and appurtenances in the aforementioned aeration basins and aerobic digesters at the Village of Carol Stream's Wastewater Reclamation Center (WRC), A certified check or bank draft, payable to the order of the Village of Carol Stream, a negotiable U.S. Government bond (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Bidders will be required to comply with all laws, including those relating to the employment of labor and the payment of the general prevailing rate of hourly wages in the locality in which the work to be performed for each craft or type of worker or mechanic needed to execute the contract or perform such work. Also, the general prevailing rate for legal holiday and overtime work (including, but not necessarily limited to 820 ILCS 130/0.01 et seq. the "Prevailing Wage Act") as ascertained by the Village shall be paid for each craft or type of worker needed to execute the contract or to perform such work. If at the time this Contract is executed, or if during the term of this Contract, there is excessive unemployment in Illinois as defined in the employment of Illinois Workers on Public Works Act, 30 ILCS 570-0.01 et seq., as two consecutive months of unemployment exceeding 5%, BIDDER agrees to employ Illinois laborers. An "Illinois laborer" is defined as any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. The Bidder shall require all subcontractors (if any) to conform with said laws, and any rules or regulations now and thereafter issued pursuant to said laws by Bidder, his subcontractors, and/or anyone working through or on behalf of Bidder or Bidder's subcontractors. Bidders will also be required to complete and sign the Public Works Governmental Compliance Certification and submit it with the bid. The Village of Carol Stream reserves the right to reject all Bids or to waive any informalities in the bidding. Bids may be held by the Village of Carol Stream for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Village of Carol Stream is an equal-opportunity employer.

Bid Results

Water / Sewer

$175,460.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
158
Bidding Soon
2,267
All Active Projects
1,024
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2022

December 5, 2022

img_map_placeholder

To Be Determined, Carol Stream, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Reclamation Center Diffuser Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.