Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a stadium in Salt Lake City, Utah. Working plans call for the renovation of a stadium; and for site work for a stadium.
DFCM Construction-Utah State Fairpark Days of 47 Arena Improvements-Supply and Install Fabricated Structural Steel and Aluminum Decking--CMGC Courtesy Posting ENTELEN Design-Build, LLC, is seeking bids from contractors to supply and install fabricated structural steel and decking at the Days of 47 Arena. North and South Steel/Platforms and Crossover Stairway: Must be substantially complete by midnight, July 11, 2022. All temporary shoring, blocking or scaffolding must be removed by this date and this phase of the project shall be substantially complete and ready for installation of fencing (where it occurs). East and West Steel/Platforms: The substantial completion date for the entire project is yet to be established. If the complete East and West Steel Platforms cannot be successfully completed and moved into place by July 18, 2022, or if attempting to complete them on schedule would jeopardize the completion of the North and South Platforms and/or Crossover Stairway, then a re-mobilization will be required. Planned installation will then occur in a short window beginning on July 27, 2022. The deadline for RFIs and questions is 5:00 PM on April 8, 2022. Submit all questions/RFIs to jaburt@entelen.com. Work of this entire structural steel, decking and railings subcontract shall start on April 15, 2022 and be substantially complete by July 11, 2022. If this completion date is not deemed achievable, in addition to your schedule provided as a part of the RFP, you should also include a brief schedule narrative explaining why it is not achievable and detailing how it will be achieved in the two phases as indicated herein. This narrative can help your scoring related to the schedule. The scope of work shall be as outlined in preliminary drawings and specifications prepared by Babcock Design and BHB Structural Engineers. This work generally includes: o Selected subcontractor shall provide design assistance with respect to availability of selected suitable materials, and their subsequent fabrication and installation schedules o Identify and procure any items required to maintain project schedule, even if required prior to receiving final design documents. Each proposer is expected to work closely with the design team to coordinate these items o Provide procurement of long-lead-time equipment and/or materials o Framing elements anticipated include wide-flange steel elements, steel angles, shopwelded connection angles and field-bolted structural connections. o Decking elements include metal pre-formed sections similar to those installed at the arena currently. Subcontractor recommendations for cost and availability will be considered in connection with the selection process. o Selected subcontractor shall procure and fabricate of said structural steel framing, railings and selected metal decking components. Chain link fencing systems shall be the work of a separate subcontract. o Selected subcontractor shall install said structural steel, railing and decking elements o Subcontractor must be diligent in communication with ENTELEN and DFCM staff regarding status of work and material deliveries occurring offsite.
Final Planning
Arenas / Stadiums
$950,000.00
Public - State/Provincial
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
November 10, 2022
155 1000 W, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: Mar 29 2022
Salt Lake City, UT
Bid Date: Mar 24 2022
Salt Lake City, UT
Bid Date: May 11 2022
Salt Lake City, UT
Bid Date: Apr 19 2022
Salt Lake City, UT
Bid Date: Apr 15 2022
Salt Lake City, UT
Bid Date: Apr 28 2022
Salt Lake City, UT
Bid Date: May 05 2022
Salt Lake City, UT
Bid Date: Apr 29 2022
Salt Lake City, UT
Bid Date: May 17 2022
Salt Lake City, UT
Bid Date: Mar 31 2022
Salt Lake City, UT
Bid Date: May 05 2022
Salt Lake City, UT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.