BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Manteca, California. Completed plans call for site work for a water / sewer project.

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as the Nile Garden Well 30 Equipping Project according to plans and specifications and according to the contract documents. The Work includes the construction and installation of a potable water well site which includes well pump building, site improvements and fencing, landscaping, irrigation piping and valving, manganese and arsenic treatment systems, pumps, and instrumentation equipment, and approximately 6,500 linear feet of 12-inch pipeline to serve Nile Garden Elementary School. Bid guarantee in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. Project shall have Substantial Completion with 365 calendar days and Final Completion within 395 calendar days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important. Time is of the essence in completing contract work in the specified number of calendar days. Any time delays due to chain supply issues will be handled on a case-by-case basis. The successful bidder will be required to furnish a Payment bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. All bonds submitted shall be from admitted sureties. The deadline to submit questions is 5:00 p.m. Pacific Standard Time on October 11, 2023. Questions regarding the contract documents shall be submitted in writing to: Attn: Frank Guillory & Kyzen Nicolas City of Manteca Department of Engineering 1001 West Center Street Manteca, CA 95337 email: fguillory@manteca.gov and knicolas@manteca.gov The City reserves the right to reject any or all bids; to make any awards or any rejections in what it alone considers to be in the best interest of the City

Bid Results

Water / Sewer

$927,853.00

Public - City

Site Work

1

1

13

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
92
Bidding Soon
1,914
All Active Projects
795
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

December 18, 2023

img_map_placeholder

5700 E Nile Ave, Manteca, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.